Permit: TC-COM-0325-00482
Permit Details
Apply Date:
03/11/2025
Applicant:
Grace Stocksdale
Description:
New warehouse building
Permit Reviews
Permit Number - TC-COM-0325-00482
Permit Status: Complete
Permit Description: New warehouse building
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/13/2025 | COMMERCIAL REVIEW - FULL v.1 | 04/04/2025 | REQUIRES RESUBMIT |
| 05/06/2026 | COMMERCIAL REVIEW - FULL v.4 | 06/02/2026 | APPROVED |
| 05/06/2025 | COMMERCIAL REVIEW - FULL v.2 | 06/03/2025 | REQUIRES RESUBMIT |
| 07/29/2025 | COMMERCIAL REVIEW - FULL v.3 | 08/14/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0325-00482
Permit Status: Complete
Permit Description: New warehouse building
| Date | Description | Comments |
|---|---|---|
| 05/27/2026 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 03/13/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 03/13/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 05/27/2026 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 03/13/2025 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. | |
| 05/27/2026 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0325-00482
Permite Description: New warehouse building
Total Outstanding Inspections - 8
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/17/2026 | COT - FCON - Fire - Final | N/A | Partial Pass | East exit sign must stay illuminated after a/c loss. Double door (east panel) shall open easily. |
| 07/31/2026 | COT - HCME - Mechanical Final | N/A | Not Applicable | |
| 08/07/2026 | COT - HCBU - Exterior Clips/Sheathing | N/A | Not Applicable | |
| 08/07/2026 | COT - HCBU - Firewall/Fire Barrier/Firestop | N/A | Not Applicable | |
| 08/07/2026 | COT - HCBU - Roof Nailing | N/A | Not Applicable | |
| 08/07/2026 | COT - HCME - Mechanical Above Ceiling | N/A | Not Applicable | |
| 08/07/2026 | COT - HCME - Mechanical Intermediate | N/A | Not Applicable | |
| 08/07/2026 | ENGR Engineering Final | N/A | Partial Pass | Site is safe, and accessible. Outstanding conditions on the permit need to be satisfied prior to final inspection. Submit these reports or documents to the portal and allow for processing time. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0325-00482
Permit Description: New warehouse building
Total Completed Inspections - 20
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/05/2026 | COT - HCPL - Rough Soil | Passed | Call Steve Koch (520) 624-1892 for inspection purposes. Approved per third party report. Kenneth M. Cawthorne 6/5/2026 |
|
| 06/10/2026 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. 6/10/2026 | |
| 07/22/2026 | COT - FCON - Fire - Final | Passed | ||
| 07/31/2026 | COT - HCEL - Electrical Final | Passed | ||
| 08/07/2026 | COT - HCBU - Building Final | Passed | ||
| 08/07/2026 | TRSP - ROW - Notice of Completion | Passed | All work on private property no work in right of way | |
| 08/07/2026 | COT - HCBU - Preslab | Passed | ||
| 08/07/2026 | COT - HCBU - Building Above Ceiling | Passed | ||
| 08/07/2026 | COT - HCBU - Framing | Passed | ||
| 08/07/2026 | COT - HCPL - Plumbing Final | Passed | ||
| 08/07/2026 | COT - HCBU - Sustainability | Passed | ||
| 08/07/2026 | COT - HCEL - Electrical Above Ceiling | Passed | ||
| 08/07/2026 | COT - HCEL - Electrical Intermediate | Passed | ||
| 08/07/2026 | COT - HCPL - Plumbing Above Ceiling | Passed | ||
| 08/07/2026 | COT - HCPL - Plumbing Intermediate | Passed | ||
| 08/07/2026 | COT - HCBU - Excavation/Rebar/Zoning | Passed | ||
| 08/07/2026 | COT - HCPL - Sewer | Passed | ||
| 08/07/2026 | COT - HCPL - Yard Water Line | Passed | ||
| 08/07/2026 | COT - LCEL - Outdoor Lighting | Passed | ||
| 08/10/2026 | ENGR Engineering Final | Passed |