Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Commercial Building
Address:
1790 E RIVER RD
Apply Date:
03/29/2024
Applicant:
Samuel Lopez
Description:
1.SHELL BUILDING IMPROVEMENT. DEMOLITION TO INCLUDE PORTIONS OF WALL AND POP OUTS AS NOTED. NEW CABLE RAILINGS AND WALL INFILL WITH INTEGRAL COLOR TWO COAT STUCCO SYSTEM TO BE ADDED. 2.NO CHANGE OF USE OR EXPANSION OF PREMISES. 3.ALL SITE CONDITIONS TO REMAIN AS IS.

Permit Reviews

Permit Number - TC-COM-0324-00560
Permit Status: Inspections complete
Permit Description: 1.SHELL BUILDING IMPROVEMENT. DEMOLITION TO INCLUDE PORTIONS OF WALL AND POP OUTS AS NOTED. NEW CABLE RAILINGS AND WALL INFILL WITH INTEGRAL COLOR TWO COAT STUCCO SYSTEM TO BE ADDED. 2.NO CHANGE OF USE OR EXPANSION OF PREMISES. 3.ALL SITE CONDITIONS TO REMAIN AS IS.
Start Date Submittal Complete Date Status  
04/01/2024 COMMERCIAL REVIEW - FULL v.1 05/02/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0324-00560
Permit Status: Inspections complete
Permit Description: 1.SHELL BUILDING IMPROVEMENT. DEMOLITION TO INCLUDE PORTIONS OF WALL AND POP OUTS AS NOTED. NEW CABLE RAILINGS AND WALL INFILL WITH INTEGRAL COLOR TWO COAT STUCCO SYSTEM TO BE ADDED. 2.NO CHANGE OF USE OR EXPANSION OF PREMISES. 3.ALL SITE CONDITIONS TO REMAIN AS IS.
Total Outstanding Activity Conditions - 1
Date Name
05/02/2024 SPECIAL INSPECTION FOR WELDING IS REQUIRED.

Conditions

Permit Number - TC-COM-0324-00560
Permit Status: Inspections complete
Permit Description: 1.SHELL BUILDING IMPROVEMENT. DEMOLITION TO INCLUDE PORTIONS OF WALL AND POP OUTS AS NOTED. NEW CABLE RAILINGS AND WALL INFILL WITH INTEGRAL COLOR TWO COAT STUCCO SYSTEM TO BE ADDED. 2.NO CHANGE OF USE OR EXPANSION OF PREMISES. 3.ALL SITE CONDITIONS TO REMAIN AS IS.
Date Description Comments
04/01/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-COM-0324-00560
Permit Description: 1.SHELL BUILDING IMPROVEMENT. DEMOLITION TO INCLUDE PORTIONS OF WALL AND POP OUTS AS NOTED. NEW CABLE RAILINGS AND WALL INFILL WITH INTEGRAL COLOR TWO COAT STUCCO SYSTEM TO BE ADDED. 2.NO CHANGE OF USE OR EXPANSION OF PREMISES. 3.ALL SITE CONDITIONS TO REMAIN AS IS.
Total Completed Inspections - 5
Date Description Inspector Results Comments
09/26/2024 COT - LCBU - Building Final Passed
09/26/2024 COT - LCBU - Framing Passed
09/26/2024 ENGR Engineering Final Passed
09/26/2024 COT - FCON - Fire - Final Passed
09/30/2024 TRSP - ROW - Final/Close-Out Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-2403_29 1790 CAMBRIC FACELIFT PERMIT SET_V1.PDF DOCUMENTS VIEW