Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-COM-0324-00553
Permit Details
Apply Date:
03/28/2024
Applicant:
samhita voma
Description:
The scope of work includes tenant improvement construction for a super food cafe that offers acai bowls, smoothies, fresh juices, soups, salads, and sandwiches. Scope of work includes construction of non-load bearing partitions for prep kitchen, dining and restroom. (N) Finishes shall be provided throughout unless noted.
Permit Reviews
Permit Number - TC-COM-0324-00553
Permit Status: Complete
Permit Description: The scope of work includes tenant improvement construction for a super food cafe that offers acai bowls, smoothies, fresh juices, soups, salads, and sandwiches.
Scope of work includes construction of non-load bearing partitions for prep kitchen, dining and restroom.
(N) Finishes shall be provided throughout unless noted.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/09/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/14/2024 | APPROVED |
05/21/2024 | RESTAMP - COMMERCIAL v.1 | 05/22/2024 | APPROVED |
07/29/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/02/2024 | APPROVED |
04/02/2024 | COMMERCIAL REVIEW - LIMITED v.2 | 04/18/2024 | REQUIRES RESUBMIT |
03/28/2024 | COMMERCIAL REVIEW - LIMITED v.1 | 04/01/2024 | REQUIRES RESUBMIT |
08/07/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/08/2024 | APPROVED |
05/20/2024 | COMMERCIAL REVIEW - LIMITED v.4 | 05/21/2024 | APPROVED |
05/01/2024 | COMMERCIAL REVIEW - LIMITED v.3 | 05/16/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0324-00553
Permit Status: Complete
Permit Description: The scope of work includes tenant improvement construction for a super food cafe that offers acai bowls, smoothies, fresh juices, soups, salads, and sandwiches.
Scope of work includes construction of non-load bearing partitions for prep kitchen, dining and restroom.
(N) Finishes shall be provided throughout unless noted.
Date | Description | Comments |
---|---|---|
04/18/2024 | AIR BALANCING REPORT IS REQUIRED. | |
04/18/2024 | COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED. | |
04/18/2024 | Separate submittal to PC Industrial Wastewater Control is required for new interceptors and separators. Contact Lucinda.Hyatt@pima.gov for review and assessment. | |
04/18/2024 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0324-00553
Permite Description: The scope of work includes tenant improvement construction for a super food cafe that offers acai bowls, smoothies, fresh juices, soups, salads, and sandwiches.
Scope of work includes construction of non-load bearing partitions for prep kitchen, dining and restroom.
(N) Finishes shall be provided throughout unless noted.
Total Outstanding Inspections - 6
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/26/2024 | COT - FCON - Alarm - Final | N/A | Not Applicable | |
07/26/2024 | COT - LCPL - Plumbing Final | N/A | Re-inspection required | 1-Install toilet seats. 2-Sink water needs to stay on for 10 seconds minimum. 3-Vent for grease trap is on the wrong side of trap. 4-Three compartment sink requires separate drains for each compartment. Recommend Level one TCO. |
07/26/2024 | ENGR Engineering Final | N/A | Partial Pass | okay for level 3 TCO. complete site cleanup for full CO |
08/13/2024 | COT - HCBU - TCO | N/A | Partial Pass | pending resolution of the following conditions: COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED. |
08/13/2024 | COT - BULD - SWG Clearance | N/A | Partial Pass | pending resolution of the following conditions: COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED. |
08/13/2024 | BULD - Electrical Clearance | N/A | Partial Pass | pending resolution of the following conditions: COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0324-00553
Permit Description: The scope of work includes tenant improvement construction for a super food cafe that offers acai bowls, smoothies, fresh juices, soups, salads, and sandwiches.
Scope of work includes construction of non-load bearing partitions for prep kitchen, dining and restroom.
(N) Finishes shall be provided throughout unless noted.
Total Completed Inspections - 16
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/24/2024 | COT - LCEL - Electrical Intermediate | Passed | Electrical rough-in above ceiling is complete. Okay to proceed with other work. | |
05/24/2024 | COT - LCME - Mechanical Intermediate | Passed | Mechanical rough-in is complete. Okay to proceed with other work. | |
05/24/2024 | COT - LCPL - Rough Soil | Passed | Plumbing underground is complete. Okay to shade pipes and backfill holes in existing floor and patch concrete floors. | |
05/24/2024 | COT - LCBU - Preslab | Passed | Plumbing underground is complete. Okay to shade pipes and backfill holes in existing floor and patch concrete floors. | |
05/24/2024 | COT - LCME - Mechanical Above Ceiling | Passed | Rough framing, mechanical, electrical, and plumbing is complete, okay to proceed. | |
05/24/2024 | COT - LCEL - Electrical Above Ceiling | Passed | Electrical rough-in above ceiling is complete. Okay to proceed with other work. | |
05/24/2024 | COT - LCBU - Framing | Passed | Rough framing, mechanical, electrical, and plumbing is complete, okay to proceed. | |
07/26/2024 | COT - FCON - Fire - Final | Passed | ||
07/26/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
07/26/2024 | COT - LCME - Mechanical Final | Passed | ||
07/25/2024 | COT - FCON - Sprinkler - Final | Passed | ||
07/29/2024 | COT - LCBU - Building Final | Passed | pending report and health department approvals. | |
07/29/2024 | COT - LCEL - Electrical Final | Passed | ||
07/29/2024 | COT - LCPL - Plumbing Final | Passed | pending report and health department approvals. | |
07/29/2024 | ENGR Engineering Final | Passed | ||
08/20/2024 | COT - HCBU - TCO | Passed | 8/20/24: ok for CofO |