Permit Details

Status:
Issued
Type:
Commercial Building
Apply Date:
03/27/2024
Applicant:
Jake Boen
Description:
Fire Restoration Building H Unit 12. (Plan set under TC-COM-0324-00537)

Permit Reviews

Permit Number - TC-COM-0324-00538
Permit Status: Issued
Permit Description: Fire Restoration Building H Unit 12. (Plan set under TC-COM-0324-00537)
Start Date Submittal Complete Date Status  
03/27/2024 COMMERCIAL REVIEW - FULL v.1 05/01/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0324-00538
Permit Status: Issued
Permit Description: Fire Restoration Building H Unit 12. (Plan set under TC-COM-0324-00537)
Total Outstanding Activity Conditions - 2
Date Name
04/29/2024 AIR BALANCING REPORT IS REQUIRED (EXHAUST FANS ONLY)
04/30/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-COM-0324-00538
Permit Status: Issued
Permit Description: Fire Restoration Building H Unit 12. (Plan set under TC-COM-0324-00537)
Date Description Comments
04/30/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Completed Inspections

Permit Status: Issued
Permit Number: TC-COM-0324-00538
Permit Description: Fire Restoration Building H Unit 12. (Plan set under TC-COM-0324-00537)
Total Completed Inspections - 2
Date Description Inspector Results Comments
06/14/2024 COT - LCBU - Framing Passed Roof trusses are properly installed and secured to top plate with H2.5 clips. Plywood sheathing is properly nailed to trusses. Drywall has been removed from interior walls, studs have been cleaned and painted with Kilz. Okay to proceed with dry-in of roof and plumbing top out. Okay to proceed with mechanical, electrical, and plumbing rough-in.
06/14/2024 COT - LCBU - Roof Nailing Passed Roof trusses are properly installed and secured to top plate with H2.5 clips. Plywood sheathing is properly nailed to trusses. Drywall has been removed from interior walls, studs have been cleaned and painted with Kilz. Okay to proceed with dry-in of roof and plumbing top out. Okay to proceed with mechanical, electrical, and plumbing rough-in.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
MANUAL JSD UNIT 12_V1.PDF DOCUMENTS VIEW