Permit Details

Status:
Issued
Type:
Commercial Building
Apply Date:
03/27/2024
Applicant:
Jake Boen
Description:
Fire Restoration Building H Unit 11 (main permit for shared plan set)

Permit Reviews

Permit Number - TC-COM-0324-00537
Permit Status: Issued
Permit Description: Fire Restoration Building H Unit 11 (main permit for shared plan set)
Start Date Submittal Complete Date Status  
05/01/2024 RESTAMP - COMMERCIAL v.1 05/01/2024 APPROVED Review Details
03/27/2024 COMMERCIAL REVIEW - FULL v.1 05/01/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0324-00537
Permit Status: Issued
Permit Description: Fire Restoration Building H Unit 11 (main permit for shared plan set)
Total Outstanding Activity Conditions - 1
Date Name
04/29/2024 AIR BALANCING REPORT IS REQUIRED (EXHAUST FANS ONLY)

Conditions

Permit Number - TC-COM-0324-00537
Permit Status: Issued
Permit Description: Fire Restoration Building H Unit 11 (main permit for shared plan set)
Date Description Comments
04/30/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Completed Inspections

Permit Status: Issued
Permit Number: TC-COM-0324-00537
Permit Description: Fire Restoration Building H Unit 11 (main permit for shared plan set)
Total Completed Inspections - 2
Date Description Inspector Results Comments
06/14/2024 COT - LCBU - Framing Passed Roof trusses are properly installed and secured to top plate with H2.5 clips. Plywood sheathing is properly nailed to trusses. Drywall has been removed from interior walls, studs have been cleaned and painted with Kilz. Okay to proceed with dry-in of roof and plumbing top out. Okay to proceed with mechanical, electrical, and plumbing rough-in.
06/14/2024 COT - LCBU - Roof Nailing Passed Roof trusses are properly installed and secured to top plate with H2.5 clips. Plywood sheathing is properly nailed to trusses. Drywall has been removed from interior walls, studs have been cleaned and painted with Kilz. Okay to proceed with dry-in of roof and plumbing top out. Okay to proceed with mechanical, electrical, and plumbing rough-in.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-PLAN SET_V1.PDF DOCUMENTS VIEW
MANUAL JSD UNIT 11_V1.PDF DOCUMENTS VIEW