Permit: TC-COM-0324-00511
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
1400 W SPEEDWAY BL
Address NEW:
1400 W SPEEDWAY BL
Apply Date:
03/22/2024
Applicant:
Christopher Perry
Description:
One to one switch out of 2 existing 60A 480V 3-Phase Disconnects. Proposed work will require a Power Kill from TEP, and a clearance for a reconnect.
Permit Reviews
Permit Number - TC-COM-0324-00511
Permit Status: Complete
Permit Description: One to one switch out of 2 existing 60A 480V 3-Phase Disconnects. Proposed work will require a Power Kill from TEP, and a clearance for a reconnect.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/22/2024 | COMMERCIAL PDSD SIMPLE REVIEW v.1 | 03/27/2024 | APPROVED |
Conditions
Permit Number - TC-COM-0324-00511
Permit Status: Complete
Permit Description: One to one switch out of 2 existing 60A 480V 3-Phase Disconnects. Proposed work will require a Power Kill from TEP, and a clearance for a reconnect.
| Date | Description | Comments |
|---|---|---|
| 03/22/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0324-00511
Permit Description: One to one switch out of 2 existing 60A 480V 3-Phase Disconnects. Proposed work will require a Power Kill from TEP, and a clearance for a reconnect.
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/08/2024 | BULD - Electrical Clearance | Passed | Approved replacement of disconnects and equipment gutter, RECN Clearance was called into TEP at 9:40am | |
| 04/08/2024 | COT - LCEL - Electrical Final | Passed |