Permit Details

Status:
Complete
Type:
Commercial Building
Address NEW:
2102 N DRAGOON ST
Apply Date:
03/19/2024
Applicant:
Cary Broschat
Description:
Install PV solar shade structure 76.5 KW dc 60 KW ac 140 modules

Permit Reviews

Permit Number - TC-COM-0324-00486
Permit Status: Complete
Permit Description: Install PV solar shade structure 76.5 KW dc 60 KW ac 140 modules
Start Date Submittal Complete Date Status  
03/19/2024 COMMERCIAL REVIEW - FULL v.1 04/19/2024 APPROVED Review Details
06/04/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/05/2024 APPROVED Review Details

Conditions

Permit Number - TC-COM-0324-00486
Permit Status: Complete
Permit Description: Install PV solar shade structure 76.5 KW dc 60 KW ac 140 modules
Date Description Comments
04/19/2024 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
04/19/2024 SPECIAL INSPECTION FOR PILING, DRILLED PIERS AND CAISSONS IS REQUIRED.
04/19/2024 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
04/19/2024 SPECIAL INSPECTION FOR FABRICATION IS REQUIRED
04/19/2024 SPECIAL INSPECTION FOR SPECIAL MOMENT RESISTING STEEL FRAMES IS REQUIRED.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0324-00486
Permit Description: Install PV solar shade structure 76.5 KW dc 60 KW ac 140 modules
Total Completed Inspections - 13
Date Description Inspector Results Comments
05/06/2024 COT - CSOL - Electrical Underground Solar Project Passed
05/06/2024 COT - LCBU - Excavation/Rebar/Zoning Passed Approved (4) column foundations per plan and special inspection report, okay for concrete placement
05/17/2024 COT - CSOL - Outdoor Lighting Solar Project Passed
05/17/2024 COT - CSOL - Grounding/Bonding Solar Project Passed
05/17/2024 COT - CSOL - Electrical Progress Solar Project Passed
05/17/2024 COT - LCBU - Framing Passed
05/17/2024 TRSP - ROW - Final/Close-Out Passed
05/29/2024 COT - CSOL - Electrical Final Solar Project Passed
05/31/2024 COT - CSOL - Electrical Intermediate Solar Project Passed
05/31/2024 ENGR Engineering Final Passed
05/31/2024 COT - LCEL - Electrical Final Passed
05/31/2024 COT - LCBU - Building Final Passed
05/31/2024 BULD - Electrical Clearance Passed Approved - DGC Clearance to TEP is required for the solar meter

Documents

File Name Document Type  
LOFC_LETTEROFCOMPLETION.PDF DOCUMENTS VIEW
COT FIRE 4 - FINAL SPECIAL INSPECTION_SIGNED-2024-06-04_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-COT- FIRE 4 - COMBINED PLAN SET_V1.PDF DOCUMENTS VIEW
COT - FIRE 4 - GEO REPORT_V1.PDF DOCUMENTS VIEW
COT - FIRE 4 STRUCTURAL CALCS_V1.PDF DOCUMENTS VIEW
SPECIAL_INSPECTION_CERTIFICATE -FIRE 4-2024-03-19_V1.PDF DOCUMENTS VIEW