Permit: TC-COM-0324-00480
Permit Details
Apply Date:
03/18/2024
Applicant:
Kelly Rehm
Description:
The TUCSON SYMPHONY ORCHESTRA Photovoltaic System will consist of 172 SILFAB 500W modules. grid-tied inverters will supply power through existing TEP service. All modules will be mounted on a custom steel structure, at a 15° tilt. The associated Development plan is TD-DEV-0124-00013.
Permit Reviews
Permit Number - TC-COM-0324-00480
Permit Status: Complete
Permit Description: The TUCSON SYMPHONY ORCHESTRA Photovoltaic System will consist of 172 SILFAB 500W modules. grid-tied inverters will supply power through existing TEP service. All modules will be mounted on a custom steel structure, at a 15° tilt. The associated Development plan is TD-DEV-0124-00013.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/18/2024 | COMMERCIAL REVIEW - FULL v.1 | 04/17/2024 | APPROVED |
| 06/04/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/05/2024 | APPROVED |
| 11/20/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/21/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-COM-0324-00480
Permit Status: Complete
Permit Description: The TUCSON SYMPHONY ORCHESTRA Photovoltaic System will consist of 172 SILFAB 500W modules. grid-tied inverters will supply power through existing TEP service. All modules will be mounted on a custom steel structure, at a 15° tilt. The associated Development plan is TD-DEV-0124-00013.
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 04/17/2024 | SPECIAL INSPECTION FOR PILING, DRILLED PIERS AND CAISSONS IS REQUIRED. |
| 04/17/2024 | SPECIAL INSPECTION FOR SPECIAL MOMENT RESISTING STEEL FRAMES AND BOLTING IS REQUIRED. |
Conditions
Permit Number - TC-COM-0324-00480
Permit Status: Complete
Permit Description: The TUCSON SYMPHONY ORCHESTRA Photovoltaic System will consist of 172 SILFAB 500W modules. grid-tied inverters will supply power through existing TEP service. All modules will be mounted on a custom steel structure, at a 15° tilt. The associated Development plan is TD-DEV-0124-00013.
| Date | Description | Comments |
|---|---|---|
| 04/17/2024 | SPECIAL INSPECTION FOR FABRICATOR IS REQUIRED |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0324-00480
Permit Description: The TUCSON SYMPHONY ORCHESTRA Photovoltaic System will consist of 172 SILFAB 500W modules. grid-tied inverters will supply power through existing TEP service. All modules will be mounted on a custom steel structure, at a 15° tilt. The associated Development plan is TD-DEV-0124-00013.
Total Completed Inspections - 13
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/24/2024 | COT - LCBU - Excavation/Rebar/Zoning | Passed | ||
| 06/04/2024 | COT - CSOL - Electrical Underground Solar Project | Passed | Approved underground electrical conduit from equipment location to the solar structure column, okay for backfill and concrete placement | |
| 06/18/2024 | COT - CSOL - Electrical Final Solar Project | Passed | Approved solar structure with line-side tap - DGC Clearance to TEP is required for the solar meter (#151515524) | |
| 06/18/2024 | COT - LCBU - Building Final | Passed | ||
| 06/18/2024 | COT - LCEL - Electrical Final | Passed | ||
| 06/18/2024 | ENGR Engineering Final | Passed | ||
| 06/18/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
| 06/18/2024 | COT - CSOL - Electrical Intermediate Solar Project | Passed | ||
| 06/18/2024 | COT - LCBU - Framing | Passed | ||
| 06/18/2024 | COT - CSOL - Electrical Progress Solar Project | Passed | ||
| 06/18/2024 | COT - CSOL - Grounding/Bonding Solar Project | Passed | ||
| 06/18/2024 | COT - CSOL - Outdoor Lighting Solar Project | Passed | ||
| 06/18/2024 | BULD - Electrical Clearance | Passed | Approved solar structure with line-side tap - DGC Clearance to TEP is required for the solar meter (#151515524) |