Permit Details

Status:
Inspections
Type:
Commercial Building
Apply Date:
03/04/2024
Applicant:
Blane Chassey
Description:
Infill half of existing loading dock. Work consists of a new 7'-6" concrete wall with 4' of which is retaining. A new trench drain, and sump pump pit will be installed as well.

Permit Reviews

Permit Number - TC-COM-0324-00404
Permit Status: Inspections
Permit Description: Infill half of existing loading dock. Work consists of a new 7'-6" concrete wall with 4' of which is retaining. A new trench drain, and sump pump pit will be installed as well.
Start Date Submittal Complete Date Status  
03/11/2024 COMMERCIAL REVIEW - FULL v.1 04/11/2024 REQUIRES RESUBMIT Review Details
04/12/2024 COMMERCIAL REVIEW - FULL v.3 04/16/2024 APPROVED Review Details
04/11/2024 COMMERCIAL REVIEW - FULL v.2 04/11/2024 REQUIRES RESUBMIT Review Details
04/16/2024 RESTAMP - COMMERCIAL v.1 04/18/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0324-00404
Permit Status: Inspections
Permit Description: Infill half of existing loading dock. Work consists of a new 7'-6" concrete wall with 4' of which is retaining. A new trench drain, and sump pump pit will be installed as well.
Total Outstanding Activity Conditions - 2
Date Name
04/09/2024 SPECIAL INSPECTION FOR CONCRETE CONSTRUCTION IS REQUIRED.
04/09/2024 SPECIAL INSPECTION FOR Expansion, Epoxy, Adhesive and Screw Anchors IS REQUIRED

Conditions

Permit Number - TC-COM-0324-00404
Permit Status: Inspections
Permit Description: Infill half of existing loading dock. Work consists of a new 7'-6" concrete wall with 4' of which is retaining. A new trench drain, and sump pump pit will be installed as well.
Date Description Comments
03/11/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-COM-0324-00404
Permite Description: Infill half of existing loading dock. Work consists of a new 7'-6" concrete wall with 4' of which is retaining. A new trench drain, and sump pump pit will be installed as well.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
12/30/2024 COT - LCME - Mechanical Final N/A Not Applicable Not Applicable there is no mechanical equipment or ductwork on this project.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-COM-0324-00404
Permit Description: Infill half of existing loading dock. Work consists of a new 7'-6" concrete wall with 4' of which is retaining. A new trench drain, and sump pump pit will be installed as well.
Total Completed Inspections - 4
Date Description Inspector Results Comments
11/27/2024 COT - LCBU - Excavation/Rebar/Zoning Passed Stem wall.
12/30/2024 COT - LCPL - Plumbing Intermediate Passed Plumbing rough-in for trench drain is complete, underground pipe for sump pump drain is installed and connected to an existing drain pipe.
12/30/2024 COT - LCEL - Electrical Final Passed The GFCI for sump pump is existing and fully functioning.
12/30/2024 COT - HCBU - Preslab Passed Concrete forms are set, rebar dowels are epoxied in to existing concrete, rebar mat is properly tied and supported off of ground. Okay to pour loading dock slab.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW