Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-COM-0323-00937
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
2456 N SILVER MOSAIC DR
Address NEW:
2456 N SILVER MOSAIC DR
Apply Date:
03/31/2023
Applicant:
Denver Johnson
Description:
Fire Damage Repair. (Phase 1: Structural Shell was approved TC-COM-1222-00355) Submitting for Arch and MEP work.
Permit Reviews
Permit Number - TC-COM-0323-00937
Permit Status: Complete
Permit Description: Fire Damage Repair. (Phase 1: Structural Shell was approved TC-COM-1222-00355) Submitting for Arch and MEP work.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/26/2023 | RESTAMP - COMMERCIAL v.1 | 06/29/2023 | APPROVED |
| 05/15/2023 | COMMERCIAL REVIEW - FULL v.2 | 06/14/2023 | REQUIRES RESUBMIT |
| 12/21/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/23/2023 | APPROVED |
| 06/22/2023 | COMMERCIAL REVIEW - FULL v.3 | 06/26/2023 | APPROVED |
| 12/18/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/18/2023 | APPROVED |
| 04/05/2023 | COMMERCIAL REVIEW - FULL v.1 | 05/04/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0323-00937
Permit Status: Complete
Permit Description: Fire Damage Repair. (Phase 1: Structural Shell was approved TC-COM-1222-00355) Submitting for Arch and MEP work.
| Date | Description | Comments |
|---|---|---|
| 05/03/2023 | AIR BALANCING REPORT IS REQUIRED. | |
| 05/04/2023 | Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents. | |
| 06/29/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. | |
| 05/04/2023 | COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED. | |
| 06/27/2023 | This project requires the completion of a Fire Construction Permit PRIOR TO FINALING this permit. | |
| 05/04/2023 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0323-00937
Permite Description: Fire Damage Repair. (Phase 1: Structural Shell was approved TC-COM-1222-00355) Submitting for Arch and MEP work.
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/07/2023 | COT - FCON - Alarm - Final | N/A | Not Ready | Need a pull station at the alarm panel to bring it up to code before fire final can be approved. |
| 12/11/2023 | COT - FCON - Fire - Final | N/A | Partial Pass | Ok for a level 4 tco. Just need the pull station installed by the alarm panel. |
| 12/19/2023 | COT - LCBU - Building Final | N/A | Partial Pass | Partial pass. Level 4 TCO. 12/19/2023 |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0323-00937
Permit Description: Fire Damage Repair. (Phase 1: Structural Shell was approved TC-COM-1222-00355) Submitting for Arch and MEP work.
Total Completed Inspections - 16
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/08/2023 | COT - LCEL - Electrical Intermediate | Passed | ||
| 08/08/2023 | COT - HCME - Mechanical Intermediate | Passed | ||
| 08/08/2023 | COT - HCPL - Plumbing Intermediate | Passed | ||
| 09/13/2023 | BULD - Electrical Clearance | Passed | Duplicate inspection. Building has power already. 9/13/2023 | |
| 11/03/2023 | COT - HCPL - Gas Pressure Test | Passed | ||
| 11/30/2023 | COT - BULD - SWG Clearance | Passed | Clearance for SOUTHWEST GAS. 11/30/2023 | |
| 12/07/2023 | COT - LCEL - Electrical Above Ceiling | Passed | ||
| 12/07/2023 | COT - FCON - Sprinkler - Final | Passed | ||
| 12/11/2023 | COT - LCEL - Electrical Final | Passed | ||
| 12/11/2023 | COT - HCME - Kitchen Hood | Passed | ||
| 12/11/2023 | COT - HCPL - Rough Soil | Passed | ||
| 12/11/2023 | COT - FCON - Hood System - Final | Passed | ||
| 12/19/2023 | COT - LCPL - Plumbing Final | Passed | ||
| 12/19/2023 | COT - HCME - Mechanical Final | Passed | ||
| 01/05/2024 | COT - FCON - Fire - Final | Passed | ||
| 01/08/2024 | COT - LCBU - Building Final | Passed |