Permit: TC-COM-0323-00913
Permit Details
Apply Date:
03/29/2023
Applicant:
Kerri Drown
Description:
Tenant Interior Upfit of Shell Building for a new Starbucks coffee shop. Signage submitted under separate permit.
Permit Reviews
Permit Number - TC-COM-0323-00913
Permit Status: Complete
Permit Description: Tenant Interior Upfit of Shell Building for a new Starbucks coffee shop. Signage submitted under separate permit.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
07/01/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/02/2024 | APPROVED |
06/15/2023 | COMMERCIAL REVIEW - FULL v.2 | 06/23/2023 | APPROVED |
02/27/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/29/2024 | APPROVED |
04/05/2023 | COMMERCIAL REVIEW - FULL v.1 | 04/26/2023 | REQUIRES RESUBMIT |
06/23/2023 | RESTAMP - COMMERCIAL v.1 | 06/27/2023 | APPROVED |
05/22/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/23/2024 | APPROVED |
Conditions
Permit Number - TC-COM-0323-00913
Permit Status: Complete
Permit Description: Tenant Interior Upfit of Shell Building for a new Starbucks coffee shop. Signage submitted under separate permit.
Date | Description | Comments |
---|---|---|
06/23/2023 | AIR BALANCING/COMMISSIONING REPORT IS REQUIRED. | |
06/23/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. | |
06/23/2023 | COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED. | |
05/23/2024 | Please submit a separate sign permit for an signs associated with this projet. | |
05/22/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
12/18/2023 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0323-00913
Permite Description: Tenant Interior Upfit of Shell Building for a new Starbucks coffee shop. Signage submitted under separate permit.
Total Outstanding Inspections - 8
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/30/2023 | COT - HCPL - Plumbing Intermediate | N/A | Partial Pass | UG Plumbing |
12/14/2023 | COT - HCBU - Framing | N/A | Partial Pass | Partial pass. Missing stud left corner of bar. 12/14/2023 |
02/09/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | Not required, this is a tenant improvement of an existing shell building. |
12/06/2023 | COT - HCBU - Preslab | N/A | Partial Pass | 12/6/23: vapor barrier and dowels installed per plan ok to pour progress area. (Preslab for electrical underground trenches) |
02/09/2024 | BULD - Electrical Clearance | N/A | Not Applicable | Not required, this is a tenant improvement of an existing shell building. |
12/05/2023 | COT - HCEL - Electrical Underground | N/A | Partial Pass | 12/5/23: electrical underground feeding kitchen, Bathrooms, break room, managers office, per plan ok to back fill. |
02/27/2024 | COT - HCBU - Building Final | N/A | Partial Pass | 2/22/24: not ready 2/27/24: level 4 TCO. Pending engineering final |
02/26/2024 | ENGR Engineering Final | N/A | Partial Pass | Level 4 TCO-The dead trees on the east side of the building need to be replaced because they’re dead and the Connex needs to be removed before giving engineering final |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0323-00913
Permit Description: Tenant Interior Upfit of Shell Building for a new Starbucks coffee shop. Signage submitted under separate permit.
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/13/2023 | COT - HCPL - Plumbing Intermediate | Passed | 12/13/23: pass for plumbing intermediate in wall and above ceiling | |
12/13/2023 | COT - HCPL - Plumbing Above Ceiling | Passed | ||
12/14/2023 | COT - HCEL - Electrical Intermediate | Passed | All in wall electrical approved. 12/14/2023 | |
12/15/2023 | COT - HCEL - Electrical Above Ceiling | Passed | 12/15/23: Electrical rough-in above hard lid ceiling is complete. Okay to insulate and drywall hard lid ceiling and walls. | |
12/15/2023 | COT - HCME - Mechanical Above Ceiling | Passed | 12/15/23: Mechanical rough-in above hard lid ceiling is complete. Okay to insulate and drywall hard lid ceiling and walls. | |
12/15/2023 | COT - HCBU - Framing | Passed | 12/15/23: Stud in left corner has been added. Okay to insulate and drywall hard lid ceiling and walls. | |
01/26/2024 | COT - HCBU - Building Above Ceiling | Passed | 1/26/24: electrical and mechanical all suspended above grid okay to place tile in ceiling | |
02/09/2024 | COT - HCEL - Electrical Final | Passed | 2/9/24: Electrical fixtures and outlets are installed correctly and functional. Electrical panels are properly labeled. GFCI outlets are installed anywhere near a water source and are functioning correctly. | |
02/09/2024 | COT - HCBU - Excavation/Rebar/Zoning | Passed | ||
02/09/2024 | COT - HCBU - Preslab | Passed | ||
02/20/2024 | COT - HCME - Mechanical Final | Passed | ||
02/20/2024 | COT - HCPL - Plumbing Final | Passed | ||
02/22/2024 | COT - LCBU - Preslab | Passed | ||
02/22/2024 | COT - HCEL - Electrical Underground | Passed | ||
02/22/2024 | COT - HCEL - Outdoor Lighting | Passed | ||
02/22/2024 | COT - HCEL - Grounding/Bonding | Passed | ||
02/22/2024 | COT - HCME - Mechanical Intermediate | Passed | ||
02/26/2024 | COT - FCON - Fire - Final | Passed | ||
07/05/2024 | COT - HCBU - Building Final | Passed | 7/5/24: Engineering final has been completed. Okay to issue permanent Certificate of Occupancy. | |
07/05/2024 | ENGR Engineering Final | Passed | ||
07/08/2024 | TRSP - ROW - Final/Close-Out | Passed |