Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Address:
1050 S PARK AV
Address NEW:
1050 S PARK AV
Apply Date:
03/29/2023
Applicant:
Brandy Burke
Description:
Increase Number of Bathroom/Shower and Number of Beds in Existing Space adding bathrom

Permit Reviews

Permit Number - TC-COM-0323-00910
Permit Status: Complete
Permit Description: Increase Number of Bathroom/Shower and Number of Beds in Existing Space adding bathrom
Start Date Submittal Complete Date Status  
05/14/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/14/2024 APPROVED Review Details
04/05/2023 COMMERCIAL REVIEW - FULL v.1 05/02/2023 APPROVED Review Details
04/12/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/12/2024 APPROVED Review Details

Conditions

Permit Number - TC-COM-0323-00910
Permit Status: Complete
Permit Description: Increase Number of Bathroom/Shower and Number of Beds in Existing Space adding bathrom
Date Description Comments
04/27/2023 AIR BALANCING REPORT IS REQUIRED.
05/02/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit.
04/12/2024 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0323-00910
Permite Description: Increase Number of Bathroom/Shower and Number of Beds in Existing Space adding bathrom
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
03/27/2024 COT - LCME - Mechanical Intermediate N/A Not Ready
04/15/2024 COT - LCPL - Plumbing Intermediate N/A Not Ready
05/03/2024 COT - LCME - Mechanical Final N/A Not Ready
05/10/2024 COT - FCON - Sprinkler - Final N/A Partial Pass Phase 2 only.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0323-00910
Permit Description: Increase Number of Bathroom/Shower and Number of Beds in Existing Space adding bathrom
Total Completed Inspections - 13
Date Description Inspector Results Comments
03/12/2024 COT - LCBU - Framing Passed
03/28/2024 COT - LCME - Mechanical Intermediate Passed
04/15/2024 COT - LCPL - Rough Soil Passed
04/24/2024 COT - HCBU - Framing Passed 4/24/24: framing at bathrooms passed.
04/24/2024 COT - HCBU - Preslab Passed
04/30/2024 COT - LCPL - Plumbing Intermediate Passed
05/03/2024 COT - LCEL - Electrical Final Passed
05/10/2024 COT - LCME - Mechanical Final Passed
05/16/2024 COT - LCPL - Plumbing Final Passed
06/13/2024 COT - FCON - Fire - Final Passed
06/13/2024 COT - FCON - Sprinkler - Final Passed
06/13/2024 COT - HCBU - CofO Passed Ok to make application for Certificate of Occupancy.
06/13/2024 COT - LCBU - Building Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
INNOVATIVE TECHNOLOGY - SISTER JOSE LAB RESULTS-2024-05-10_V1.PDF DOCUMENTS VIEW
SISTER JOSE WOMEN'S CENTER - REPORT_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
23046 MECH CHECK_V1.PDF DOCUMENTS VIEW
CONS-1_A-1 THRU E2.0 SISTER JOSE WOMENS CENTER 03-28-23_V1.PDF DOCUMENTS VIEW
23046 SYSTEMS DESIGN REPORT_V1.PDF DOCUMENTS VIEW