Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
03/20/2023
Applicant:
Lisa Bowers
Description:
TI: Cardiovascular Clinic

Permit Reviews

Permit Number - TC-COM-0323-00836
Permit Status: Complete
Permit Description: TI: Cardiovascular Clinic
Start Date Submittal Complete Date Status  
05/23/2023 RESTAMP - COMMERCIAL v.1 05/24/2023 APPROVED Review Details
05/12/2023 COMMERCIAL REVIEW - FULL v.2 05/23/2023 APPROVED Review Details
03/22/2023 COMMERCIAL REVIEW - FULL v.1 04/19/2023 REQUIRES RESUBMIT Review Details
01/30/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/31/2024 APPROVED Review Details
01/18/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/18/2024 APPROVED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0323-00836
Permite Description: TI: Cardiovascular Clinic
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
COT - HCME - Mechanical Intermediate N/A Requested
09/14/2023 COT - HCPL - Plumbing Intermediate N/A Partial Pass 9/14/23: domestic water hot & cold approved. All new pvc vents approved.
01/05/2024 BULD - Electrical Clearance N/A Not Applicable
01/05/2024 COT - BULD - SWG Clearance N/A Not Applicable
03/12/2024 COT - FCON - Fire - Final N/A Partial Pass Access doors, still need to be worked out, mag locks are connected to the fire alarm.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0323-00836
Permit Description: TI: Cardiovascular Clinic
Total Completed Inspections - 20
Date Description Inspector Results Comments
07/28/2023 COT - HCPL - Rough Soil Passed UG Plumbing, except SW corner where leak is; oK to cover elsewhere.
7/28/23: OK to cover all under slab soil pipe.
08/09/2023 COT - HCBU - Preslab Passed
09/14/2023 COT - HCPL - Plumbing Progress Passed
09/25/2023 COT - HCEL - Electrical Intermediate Passed
09/25/2023 COT - HCBU - Framing Passed
09/29/2023 COT - HCBU - Building Progress Passed
12/21/2023 COT - HCPL - Plumbing Above Ceiling Passed
12/21/2023 COT - HCPL - Plumbing Intermediate Passed
12/27/2023 COT - HCME - Mechanical Progress Passed 12/27/23: Mechanical and electrical above ceiling has been strapped up to prevent it touching grid ceiling. Okay to install ceiling tiles throughout building.
12/27/2023 COT - HCEL - Electrical Progress Passed 12/27/23: Mechanical and electrical above ceiling has been strapped up to prevent it touching grid ceiling. Okay to install ceiling tiles throughout building.
12/27/2023 COT - HCBU - Building Above Ceiling Passed 12/27/23: Mechanical and electrical above ceiling has been strapped up to prevent it touching grid ceiling. Okay to install ceiling tiles throughout building.
01/08/2024 ENGR Engineering Final Passed
01/08/2024 TRSP - ROW - Final/Close-Out Passed
01/31/2024 COT - HCME - Mechanical Final Passed
01/31/2024 COT - HCEL - Electrical Final Passed
01/31/2024 COT - HCPL - Plumbing Final Passed
02/29/2024 COT - FCON - Alarm - Final Passed
03/21/2024 COT - FCON - Fire - Final Passed
03/22/2024 COT - HCBU - CofO Passed
03/22/2024 COT - HCBU - Building Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
BANNER CARDIO TAB REPORT FLOOR PLAN_V1.PDF DOCUMENTS VIEW
BUMG CARDIO VASCULAR (CHLORINATION REPORT)_240116_105127_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-2_PLAN SET_V2.PDF DOCUMENTS VIEW
2_CALC-123136 TRI-POINTE PLAZA BANNER C.V. CLINIC ROOF REVIEW_V1.PDF DOCUMENTS VIEW
2_COMCHECK CALC (05.10.23)_V1.PDF DOCUMENTS VIEW
(AS-BUILT) EL CERT 6365 E TANQUE VERDE RD - COMPLETE 05-03-2023.PDF DOCUMENTS VIEW
1_MECHANICAL LOAD CALC_V1.PDF DOCUMENTS VIEW
CONS-1_PLAN SET_V1.PDF DOCUMENTS VIEW