Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Complete
Type:
Commercial Building
Address:
33 S 6TH AV
Address NEW:
33 S 6TH AV
Apply Date:
03/08/2023
Applicant:
Albert LeCocq
Description:
Commercial interior renovation of an existing space to become an event center/banquet hall.

Permit Reviews

Permit Number - TC-COM-0323-00777
Permit Status: Complete
Permit Description: Commercial interior renovation of an existing space to become an event center/banquet hall.
Start Date Submittal Complete Date Status  
03/17/2023 COMMERCIAL REVIEW - FULL v.2 08/03/2023 REQUIRES RESUBMIT Review Details
03/05/2024 COMMERCIAL REVIEW - FULL v.2 05/03/2024 APPROVED Review Details
08/07/2023 COMMERCIAL REVIEW - FULL v.3 08/14/2023 APPROVED Review Details
12/15/2023 COMMERCIAL REVIEW - FULL v.1 02/28/2024 REQUIRES RESUBMIT Review Details
03/14/2023 COMMERCIAL REVIEW - FULL v.1 03/14/2023 REQUIRES RESUBMIT Review Details
04/02/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/14/2025 APPROVED Review Details
11/20/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/21/2024 APPROVED Review Details
11/04/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/05/2024 APPROVED Review Details
08/14/2023 RESTAMP - COMMERCIAL v.1 08/22/2023 APPROVED Review Details
01/29/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/30/2025 APPROVED Review Details

Conditions

Permit Number - TC-COM-0323-00777
Permit Status: Complete
Permit Description: Commercial interior renovation of an existing space to become an event center/banquet hall.
Date Description Comments
11/18/2024 AIR BALANCING REPORT IS REQUIRED.
08/03/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
11/18/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
11/18/2024 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
08/03/2023 Plan review applications expire 180 days from date of submittal unless the permit has been issued. Permits expire 180 days after issuance or last approved inspection.
11/18/2024 Post-Installed Anchor Inspection Report is required.
02/19/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
08/03/2023 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0323-00777
Permite Description: Commercial interior renovation of an existing space to become an event center/banquet hall.
Total Outstanding Inspections - 9
Last Inspection Date Description Inspector Results Comments
08/31/2023 COT - HCPL - Plumbing Intermediate N/A Re-inspection required No access for inspection.
08/31/2023 COT - HCBU - Framing N/A Re-inspection required No access for inspection.
08/31/2023 COT - HCBU - Preslab N/A Re-inspection required No access for inspection.
05/14/2024 COT - BULD - SWG Clearance N/A Not Applicable No gas service on site.
11/30/2023 BULD - Electrical Clearance N/A Not Ready 11/30/23: not ready
11/30/2023 COT - HCEL - Grounding/Bonding N/A Not Ready 11/30/23: not ready
COT - FCON - Alarm - Final N/A Not Ready
COT - FCON - Sprinkler - Final N/A Not Ready
COT - FCON - Fire - Final N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0323-00777
Permit Description: Commercial interior renovation of an existing space to become an event center/banquet hall.
Total Completed Inspections - 20
Date Description Inspector Results Comments
09/05/2023 COT - HCPL - Plumbing Intermediate Passed
09/05/2023 COT - HCBU - Framing Passed
09/05/2023 COT - HCBU - Preslab Passed
11/30/2023 COT - HCBU - Building Above Ceiling Passed
11/30/2023 COT - HCME - Mechanical Intermediate Passed
11/30/2023 COT - HCME - Mechanical Above Ceiling Passed
11/30/2023 COT - HCPL - Plumbing Above Ceiling Passed
11/30/2023 COT - HCEL - Electrical Intermediate Passed
11/30/2023 COT - HCEL - Electrical Above Ceiling Passed
11/30/2023 COT - HCPL - Rough Soil Passed
05/16/2024 TRSP - ROW - Final/Close-Out Passed
05/14/2024 COT - HCEL - Grounding/Bonding Passed
10/16/2024 COT - FCON - Alarm - Final Passed
10/16/2024 COT - FCON - Sprinkler - Final Passed
10/16/2024 COT - HCBU - Building Final Passed
10/16/2024 COT - HCEL - Electrical Final Passed
10/16/2024 COT - HCME - Mechanical Final Passed
10/16/2024 COT - HCPL - Plumbing Final Passed
10/24/2024 COT - FCON - Fire - Final Passed
10/16/2024 ENGR Engineering Final Passed