Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
03/07/2023
Applicant:
Lisa Bowers
Description:
Shell building for Starbucks Coffee.

Permit Reviews

Permit Number - TC-COM-0323-00772
Permit Status: Complete
Permit Description: Shell building for Starbucks Coffee.
Start Date Submittal Complete Date Status  
02/06/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/07/2024 APPROVED Review Details
07/12/2023 RESTAMP - COMMERCIAL v.1 07/24/2023 APPROVED Review Details
08/30/2023 COMMERCIAL REVIEW - FULL v.3 08/31/2023 APPROVED Review Details
08/31/2023 RESTAMP - COMMERCIAL v.1 09/07/2023 APPROVED Review Details
01/25/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/26/2024 APPROVED Review Details
10/18/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.2 10/18/2023 APPROVED Review Details
10/05/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/10/2023 REQUIRES RESUBMIT Review Details
07/12/2023 COMMERCIAL REVIEW - FULL v.2 07/12/2023 APPROVED Review Details
08/08/2023 COMMERCIAL REVIEW - FULL v.1 08/29/2023 REQUIRES RESUBMIT Review Details
03/14/2023 COMMERCIAL REVIEW - FULL v.1 07/11/2023 REQUIRES RESUBMIT Review Details
08/30/2023 COMMERCIAL REVIEW - FULL v.2 08/30/2023 APPROVED Review Details

Conditions

Permit Number - TC-COM-0323-00772
Permit Status: Complete
Permit Description: Shell building for Starbucks Coffee.
Date Description Comments
07/11/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
03/16/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit.
07/11/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
07/11/2023 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
07/11/2023 Plan review applications expire 180 days from date of submittal unless the permit has been issued. Permits expire 180 days after issuance or last approved inspection.
07/11/2023 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
07/11/2023 SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED.
07/11/2023 Masonry Inspection Report submittal review is required.
07/11/2023 Pre-Manufactured Canopies Designs must be submitted and approved prior to final.
07/11/2023 Post-Installed Anchor Inspection Report is required.
07/11/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
07/11/2023 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.
07/11/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0323-00772
Permite Description: Shell building for Starbucks Coffee.
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
11/03/2023 COT - HCBU - Masonry Pregrout N/A Not Applicable Not required for this project. Per Project Superintendent Tony White there is no masonry walls on this project.
11/27/2023 COT - HCBU - Building Above Ceiling N/A Not Applicable Looked at drywall nailing.
02/13/2024 COT - BULD - SWG Clearance N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0323-00772
Permit Description: Shell building for Starbucks Coffee.
Total Completed Inspections - 26
Date Description Inspector Results Comments
09/29/2023 COT - HCPL - Sewer Passed 9/29/23: sewer connection from grease interceptor to main sewer. ok to backfill.
10/05/2023 COT - HCPL - Yard Water Line Passed
10/12/2023 COT - HCBU - Exterior Clips/Sheathing Passed
10/12/2023 COT - HCBU - Roof Nailing Passed
10/31/2023 COT - HCBU - Framing Passed
10/31/2023 COT - HCEL - Electrical Intermediate Passed
10/31/2023 COT - HCPL - Plumbing Intermediate Passed
10/31/2023 COT - HCME - Mechanical Intermediate Passed
11/07/2023 COT - HCPL - Gas Pressure Test Passed
11/15/2023 COT - HCEL - Electrical Underground Passed
11/15/2023 COT - HCEL - Grounding/Bonding Passed
11/29/2023 COT - HCEL - Electrical Above Ceiling Passed 11/29/23: conduits for secondary per plan ok to backfill.
12/11/2023 BULD - Electrical Clearance Passed
12/18/2023 COT - HCBU - Preslab Passed
12/18/2023 COT - HCME - Mechanical Above Ceiling Passed
12/18/2023 COT - HCPL - Plumbing Above Ceiling Passed
12/18/2023 COT - HCPL - Rough Soil Passed
01/29/2024 COT - HCPL - Gas Final Passed Gas line is complete to all gas appliances in the building and on the roof. Okay to proceed with connecting gas meter.
02/13/2024 COT - HCME - Mechanical Final Passed
02/13/2024 COT - HCPL - Plumbing Final Passed
02/13/2024 COT - HCEL - Outdoor Lighting Passed
02/13/2024 COT - HCEL - Electrical Final Passed
02/13/2024 COT - FCON - Fire - Final Passed
02/16/2024 COT - HCBU - Building Final Passed Shell building is complete. Okay to issue Certificate of Completion for this permit.
02/16/2024 ENGR Engineering Final Passed
02/21/2024 TRSP - ROW - Final/Close-Out Passed See ROW Permit.

Documents

File Name Document Type  
LOFC_LETTEROFCOMPLETION.PDF DOCUMENTS VIEW
CLOSEOUT LETTER-2402-06_V1.PDF DOCUMENTS VIEW
STARBUCKS GRANT AND CAMPBELL FINAL (2)-2024-01-25_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-PLAN SET_V2_V1.PDF DOCUMENTS VIEW
23015 - SUPPLEMENTAL STRUCTURAL CALCULATIONS_V1_V1.PDF DOCUMENTS VIEW
REVISION NARRATIVE_V2_V1.PDF DOCUMENTS VIEW
CONS-494E46AC-57F4-44B1-83B7-3E57F12AD4E1_V1.PDF DOCUMENTS VIEW
CONS-STANTEC APPROVED PLAN SET_V1.PDF DOCUMENTS VIEW
22144-STARBUCKS SHELL-STANTEC PSA_V1.PDF DOCUMENTS VIEW
22144-STARBUCKS SHELL-STRUCTURAL CALCULATIONS_V1.PDF DOCUMENTS VIEW
CONS-22144-STARBUCKS SHELL-PLAN SET_V1.PDF DOCUMENTS VIEW
22144-STARBUCKS SHELL-STANTEC PSA_V1.PDF DOCUMENTS VIEW
22144-STARBUCKS SHELL-STRUCTURAL CALCULATIONS_V1.PDF DOCUMENTS VIEW
22144-STARBUCKS SHELL-STANTEC PSA_V1.PDF DOCUMENTS VIEW
22144-STARBUCKS SHELL-STRUCTURAL CALCULATIONS_V1.PDF DOCUMENTS VIEW
22144-STARBUCKS SHELL-STANTEC PSA_V1.PDF DOCUMENTS VIEW
22144-STARBUCKS SHELL-STRUCTURAL CALCULATIONS_V1.PDF DOCUMENTS VIEW
22144-STARBUCKS SHELL-STANTEC PSA_V1.PDF DOCUMENTS VIEW
22144-STARBUCKS SHELL-STRUCTURAL CALCULATIONS_V1.PDF DOCUMENTS VIEW
22144-STARBUCKS SHELL-STANTEC PSA_V1.PDF DOCUMENTS VIEW
22144-STARBUCKS SHELL-STRUCTURAL CALCULATIONS_V1.PDF DOCUMENTS VIEW
22144-STARBUCKS SHELL-STANTEC PSA_V1.PDF DOCUMENTS VIEW
22144-STARBUCKS SHELL-STRUCTURAL CALCULATIONS_V1.PDF DOCUMENTS VIEW
22144-STARBUCKS SHELL-STANTEC PSA_V1.PDF DOCUMENTS VIEW
22144-STARBUCKS SHELL-STRUCTURAL CALCULATIONS_V1.PDF DOCUMENTS VIEW
22144-STARBUCKS SHELL-STANTEC PSA_V1.PDF DOCUMENTS VIEW
22144-STARBUCKS SHELL-STRUCTURAL CALCULATIONS_V1.PDF DOCUMENTS VIEW
22144-STARBUCKS SHELL-STANTEC PSA_V1.PDF DOCUMENTS VIEW
22144-STARBUCKS SHELL-STRUCTURAL CALCULATIONS_V1.PDF DOCUMENTS VIEW
22144-STARBUCKS SHELL-STANTEC PSA_V1.PDF DOCUMENTS VIEW
22144-STARBUCKS SHELL-STRUCTURAL CALCULATIONS_V1.PDF DOCUMENTS VIEW
22144-STARBUCKS SHELL-STANTEC PSA_V1.PDF DOCUMENTS VIEW
22144-STARBUCKS SHELL-STRUCTURAL CALCULATIONS_V1.PDF DOCUMENTS VIEW
22144-STARBUCKS SHELL-STANTEC PSA_V1.PDF DOCUMENTS VIEW
22144-STARBUCKS SHELL-STRUCTURAL CALCULATIONS_V1.PDF DOCUMENTS VIEW
22144-STARBUCKS SHELL-STANTEC PSA_V1.PDF DOCUMENTS VIEW
22144-STARBUCKS SHELL-STRUCTURAL CALCULATIONS_V1.PDF DOCUMENTS VIEW
22144-STARBUCKS SHELL-STANTEC PSA_V1.PDF DOCUMENTS VIEW
22144-STARBUCKS SHELL-STRUCTURAL CALCULATIONS_V1.PDF DOCUMENTS VIEW
22144-STARBUCKS SHELL-STANTEC PSA_V1.PDF DOCUMENTS VIEW
22144-STARBUCKS SHELL-STRUCTURAL CALCULATIONS_V1.PDF DOCUMENTS VIEW