Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
02/19/2026
Applicant:
Rafi Topalian
Description:
Replace existing coolers and install new island merchandiser. Remove and install new cash wrap

Permit Reviews

Permit Number - TC-COM-0226-00246
Permit Status: Complete
Permit Description: Replace existing coolers and install new island merchandiser. Remove and install new cash wrap
Start Date Submittal Complete Date Status  
04/03/2026 COMMERCIAL REVIEW - FULL v.2 04/03/2026 REQUIRES RESUBMIT Review Details
02/24/2026 COMMERCIAL REVIEW - FULL v.1 03/18/2026 REQUIRES RESUBMIT Review Details
04/08/2026 COMMERCIAL REVIEW - FULL v.3 04/10/2026 APPROVED Review Details
04/10/2026 ADMINISTRATIVE v.1 04/10/2026 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-COM-0226-00246
Permit Status: Complete
Permit Description: Replace existing coolers and install new island merchandiser. Remove and install new cash wrap
Date Description Comments
02/24/2026 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
02/24/2026 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0226-00246
Permit Description: Replace existing coolers and install new island merchandiser. Remove and install new cash wrap
Total Completed Inspections - 6
Date Description Inspector Results Comments
06/13/2026 COT - LCEL - Electrical Intermediate Passed
06/13/2026 COT - LCBU - Framing Passed
06/13/2026 COT - LCEL - Electrical Above Ceiling Passed
06/13/2026 COT - LCEL - Electrical Final Passed
06/13/2026 COT - LCBU - Building Final Passed
06/15/2026 COT - FCON - Fire - Final Passed