Permit Details

Status:
Complete
Type:
Commercial Building
Address:
200 E YAVAPAI RD
Address NEW:
200 E YAVAPAI RD
Apply Date:
02/10/2026
Applicant:
Kelly Rehm
Description:
The Literacy Connects PV system will consist of 83 500W modules, roof-mounted with racking. Grid-tied microinverters will supply power through an existing TEP service via a feeder tap interconnection.

Permit Reviews

Permit Number - TC-COM-0226-00195
Permit Status: Complete
Permit Description: The Literacy Connects PV system will consist of 83 500W modules, roof-mounted with racking. Grid-tied microinverters will supply power through an existing TEP service via a feeder tap interconnection.
Start Date Submittal Complete Date Status  
02/11/2026 COMMERCIAL REVIEW - FULL v.1 03/09/2026 APPROVED Review Details

Conditions

Permit Number - TC-COM-0226-00195
Permit Status: Complete
Permit Description: The Literacy Connects PV system will consist of 83 500W modules, roof-mounted with racking. Grid-tied microinverters will supply power through an existing TEP service via a feeder tap interconnection.
Date Description Comments
02/11/2026 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0226-00195
Permit Description: The Literacy Connects PV system will consist of 83 500W modules, roof-mounted with racking. Grid-tied microinverters will supply power through an existing TEP service via a feeder tap interconnection.
Total Completed Inspections - 4
Date Description Inspector Results Comments
04/01/2026 COT - CSOL - Electrical Final Solar Project Passed O4/01/2026
Approved clearance TEP DGC for 83 panel rooftop PV system.
04/01/2026 COT - LCBU - Building Final Passed
04/01/2026 ENGR Engineering Final Passed
04/01/2026 BULD - Electrical Clearance Passed O4/01/2026
Approved clearance TEP DGC.