Permit: TC-COM-0226-00195
Permit Details
Status:
Inspections Complete
Type:
Commercial Building
Address:
200 E YAVAPAI RD
Address NEW:
200 E YAVAPAI RD
Apply Date:
02/10/2026
Applicant:
Kelly Rehm
Description:
The Literacy Connects PV system will consist of 83 500W modules, roof-mounted with racking. Grid-tied microinverters will supply power through an existing TEP service via a feeder tap interconnection.
Permit Reviews
Permit Number - TC-COM-0226-00195
Permit Status: Inspections complete
Permit Description: The Literacy Connects PV system will consist of 83 500W modules, roof-mounted with racking. Grid-tied microinverters will supply power through an existing TEP service via a feeder tap interconnection.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/11/2026 | COMMERCIAL REVIEW - FULL v.1 | 03/09/2026 | APPROVED |
Conditions
Permit Number - TC-COM-0226-00195
Permit Status: Inspections complete
Permit Description: The Literacy Connects PV system will consist of 83 500W modules, roof-mounted with racking. Grid-tied microinverters will supply power through an existing TEP service via a feeder tap interconnection.
| Date | Description | Comments |
|---|---|---|
| 02/11/2026 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-COM-0226-00195
Permit Description: The Literacy Connects PV system will consist of 83 500W modules, roof-mounted with racking. Grid-tied microinverters will supply power through an existing TEP service via a feeder tap interconnection.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/01/2026 | COT - CSOL - Electrical Final Solar Project | Passed | O4/01/2026 Approved clearance TEP DGC for 83 panel rooftop PV system. |
|
| 04/01/2026 | COT - LCBU - Building Final | Passed | ||
| 04/01/2026 | ENGR Engineering Final | Passed | ||
| 04/01/2026 | BULD - Electrical Clearance | Passed | O4/01/2026 Approved clearance TEP DGC. |