Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-COM-0225-00357
Permit Details
Status:
Inspections
Type:
Commercial Building
Address:
6901 E BROADWAY BL UNIT 133
Address NEW:
6901 E BROADWAY BL UNIT 133
Apply Date:
02/19/2025
Applicant:
Diane Krebs
Description:
Interior renovation of existing space turning it into a sales/leasing office
Permit Reviews
Permit Number - TC-COM-0225-00357
Permit Status: Inspections
Permit Description: Interior renovation of existing space turning it into a sales/leasing office
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/14/2025 | COMMERCIAL REVIEW - LIMITED v.4 | 04/21/2025 | APPROVED |
| 04/10/2025 | COMMERCIAL REVIEW - LIMITED v.3 | 04/11/2025 | REQUIRES RESUBMIT |
| 04/21/2025 | RESTAMP - COMMERCIAL v.1 | 04/23/2025 | APPROVED |
| 02/25/2025 | COMMERCIAL REVIEW - LIMITED v.1 | 02/25/2025 | REQUIRES RESUBMIT |
| 03/07/2025 | COMMERCIAL REVIEW - LIMITED v.2 | 03/28/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0225-00357
Permit Status: Inspections
Permit Description: Interior renovation of existing space turning it into a sales/leasing office
| Date | Description | Comments |
|---|---|---|
| 02/25/2025 | Address on construction plan does not match address on permit application. UNIT 133 will need to be added to the official address on the construction plans prior to issuance. | |
| 02/25/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-COM-0225-00357
Permite Description: Interior renovation of existing space turning it into a sales/leasing office
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/16/2025 | COT - LCPL - Plumbing Final | N/A | Partial Pass | Rough in |
| 06/16/2025 | COT - LCME - Mechanical Final | N/A | Partial Pass | Rough in |
| 06/16/2025 | COT - LCEL - Electrical Final | N/A | Partial Pass | Rough in |