Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Commercial Building
Apply Date:
02/18/2025
Applicant:
Kim Filuk
Description:
320 sf security office Addition in exist 7,848 square foot offices. Includes framed walls, interior walls, interior finishes, framed lid for security of room, mechanical and electrical

Permit Reviews

Permit Number - TC-COM-0225-00347
Permit Status: Inspections
Permit Description: 320 sf security office Addition in exist 7,848 square foot offices. Includes framed walls, interior walls, interior finishes, framed lid for security of room, mechanical and electrical
Start Date Submittal Complete Date Status  
04/23/2025 RESTAMP - COMMERCIAL v.1 04/24/2025 APPROVED Review Details
02/24/2025 COMMERCIAL REVIEW - FULL v.1 03/24/2025 REQUIRES RESUBMIT Review Details
04/01/2025 COMMERCIAL REVIEW - FULL v.2 04/23/2025 APPROVED Review Details

Conditions

Permit Number - TC-COM-0225-00347
Permit Status: Inspections
Permit Description: 320 sf security office Addition in exist 7,848 square foot offices. Includes framed walls, interior walls, interior finishes, framed lid for security of room, mechanical and electrical
Date Description Comments
02/24/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
02/24/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-COM-0225-00347
Permit Description: 320 sf security office Addition in exist 7,848 square foot offices. Includes framed walls, interior walls, interior finishes, framed lid for security of room, mechanical and electrical
Total Completed Inspections - 8
Date Description Inspector Results Comments
05/06/2025 COT - HCEL - Electrical Intermediate Passed
05/06/2025 COT - LCBU - Framing Passed
05/29/2025 COT - LCME - Mechanical Intermediate Passed
05/29/2025 COT - LCEL - Electrical Above Ceiling Passed
06/04/2025 COT - LCEL - Electrical Final Passed
06/05/2025 ENGR Engineering Final Passed Site is clean and clear. CofO ready.
06/05/2025 COT - LCME - Mechanical Final Passed
06/05/2025 COT - LCBU - Building Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-QTTUCSON REMODEL 2ND SUBMITTAL _25-0326_V2.PDF DOCUMENTS VIEW