Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-COM-0225-00333
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
2345 E IRVINGTON RD
Address NEW:
2345 E IRVINGTON RD
Apply Date:
02/17/2025
Applicant:
Jaris Brenneman
Description:
Coffee Wow Phase 2: Updated equipment and millwork to existing coffee bar. Installation of new drain manifold serving the coffee bar. Added dedicated water line and circuit for coffee wow auto clean system. Add glycol chiller and nitrogen generator for nitro coffee.
Permit Reviews
Permit Number - TC-COM-0225-00333
Permit Status: Complete
Permit Description: Coffee Wow Phase 2: Updated equipment and millwork to existing coffee bar.
Installation of new drain manifold serving the coffee bar.
Added dedicated water line and circuit for coffee wow auto clean system.
Add glycol chiller and nitrogen generator for nitro coffee.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/25/2025 | RESTAMP - COMMERCIAL v.1 | 03/26/2025 | APPROVED |
| 03/11/2025 | COMMERCIAL REVIEW - LIMITED v.2 | 03/25/2025 | APPROVED |
| 02/21/2025 | COMMERCIAL REVIEW - LIMITED v.1 | 03/07/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0225-00333
Permit Status: Complete
Permit Description: Coffee Wow Phase 2: Updated equipment and millwork to existing coffee bar.
Installation of new drain manifold serving the coffee bar.
Added dedicated water line and circuit for coffee wow auto clean system.
Add glycol chiller and nitrogen generator for nitro coffee.
| Date | Description | Comments |
|---|---|---|
| 02/21/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0225-00333
Permite Description: Coffee Wow Phase 2: Updated equipment and millwork to existing coffee bar.
Installation of new drain manifold serving the coffee bar.
Added dedicated water line and circuit for coffee wow auto clean system.
Add glycol chiller and nitrogen generator for nitro coffee.
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/09/2025 | BULD - Electrical Clearance | N/A | Not Applicable | |
| 04/09/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 04/09/2025 | ENGR Engineering Final | N/A | Not Applicable | No exterior work |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0225-00333
Permit Description: Coffee Wow Phase 2: Updated equipment and millwork to existing coffee bar.
Installation of new drain manifold serving the coffee bar.
Added dedicated water line and circuit for coffee wow auto clean system.
Add glycol chiller and nitrogen generator for nitro coffee.
Total Completed Inspections - 10
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/09/2025 | COT - FCON - Fire - Final | Passed | ||
| 04/09/2025 | COT - LCBU - Building Final | Passed | ||
| 04/09/2025 | COT - LCEL - Electrical Final | Passed | ||
| 04/09/2025 | COT - LCME - Mechanical Final | Passed | ||
| 04/09/2025 | COT - LCPL - Plumbing Final | Passed | ||
| 04/09/2025 | TRSP - ROW - Final/Close-Out | Passed | ||
| 04/09/2025 | COT - LCEL - Electrical Above Ceiling | Passed | ||
| 04/09/2025 | COT - LCPL - Plumbing Intermediate | Passed | ||
| 04/17/2025 | COT - LCEL - Electrical Intermediate | Passed | ||
| 04/17/2025 | COT - LCEL - Grounding/Bonding | Passed |