Permit: TC-COM-0225-00332
Permit Details
Apply Date:
02/17/2025
Applicant:
Jaris Brenneman
Description:
Coffee Wow Phase 2: Updated equipment and millwork to existing coffee bar. Installation of new drain manifold serving the coffee bar. Added dedicated water line and circuit for coffee wow auto clean system. Add glycol chiller and nitrogen generator for nitro coffee.
Permit Reviews
Permit Number - TC-COM-0225-00332
Permit Status: Complete
Permit Description: Coffee Wow Phase 2: Updated equipment and millwork to existing coffee bar.
Installation of new drain manifold serving the coffee bar.
Added dedicated water line and circuit for coffee wow auto clean system.
Add glycol chiller and nitrogen generator for nitro coffee.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/02/2025 | RESTAMP - COMMERCIAL v.1 | 04/07/2025 | APPROVED |
| 02/21/2025 | COMMERCIAL REVIEW - LIMITED v.1 | 03/17/2025 | REQUIRES RESUBMIT |
| 03/18/2025 | COMMERCIAL REVIEW - LIMITED v.2 | 04/02/2025 | APPROVED |
Conditions
Permit Number - TC-COM-0225-00332
Permit Status: Complete
Permit Description: Coffee Wow Phase 2: Updated equipment and millwork to existing coffee bar.
Installation of new drain manifold serving the coffee bar.
Added dedicated water line and circuit for coffee wow auto clean system.
Add glycol chiller and nitrogen generator for nitro coffee.
| Date | Description | Comments |
|---|---|---|
| 04/07/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 04/17/2025 | Prior to Issuance: This project requires issuance of a Development Package (DP) permit prior to issuance of this permit. Prior to TCO/Final: This project requires full completion of a Development Package (DP) permit prior to Temporary C of O and/or final completion this permit. | |
| 02/21/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0225-00332
Permite Description: Coffee Wow Phase 2: Updated equipment and millwork to existing coffee bar.
Installation of new drain manifold serving the coffee bar.
Added dedicated water line and circuit for coffee wow auto clean system.
Add glycol chiller and nitrogen generator for nitro coffee.
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/21/2025 | BULD - Electrical Clearance | N/A | Not Applicable | |
| 04/21/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 04/23/2025 | COT - LCEL - Grounding/Bonding | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0225-00332
Permit Description: Coffee Wow Phase 2: Updated equipment and millwork to existing coffee bar.
Installation of new drain manifold serving the coffee bar.
Added dedicated water line and circuit for coffee wow auto clean system.
Add glycol chiller and nitrogen generator for nitro coffee.
Total Completed Inspections - 10
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/21/2025 | COT - FCON - Fire - Final | Passed | ||
| 04/21/2025 | COT - LCBU - Building Final | Passed | ||
| 04/21/2025 | COT - LCEL - Electrical Final | Passed | ||
| 04/21/2025 | COT - LCME - Mechanical Final | Passed | ||
| 04/21/2025 | COT - LCPL - Plumbing Final | Passed | ||
| 04/21/2025 | ENGR Engineering Final | Passed | ||
| 04/21/2025 | TRSP - ROW - Final/Close-Out | Passed | ||
| 04/21/2025 | COT - LCEL - Electrical Above Ceiling | Passed | ||
| 04/23/2025 | COT - LCPL - Plumbing Intermediate | Passed | Final inspection have been approved per Burge. 4/23/2025 | |
| 04/23/2025 | COT - LCEL - Electrical Intermediate | Passed | Final inspection have been approved per Burge. 4/23/2025 |