Permit: TC-COM-0225-00331
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
3636 N CRAYCROFT RD
Address NEW:
3636 N CRAYCROFT RD
Apply Date:
02/17/2025
Applicant:
Jaris Brenneman
Description:
Coffee Wow Phase 2: Updated equipment and millwork to existing coffee bar. Installation of new drain manifold serving the coffee bar. Added dedicated water line and circuit for coffee wow auto clean system. Add glycol chiller and nitrogen generator for nitro coffee.
Permit Reviews
Permit Number - TC-COM-0225-00331
Permit Status: Complete
Permit Description: Coffee Wow Phase 2: Updated equipment and millwork to existing coffee bar.
Installation of new drain manifold serving the coffee bar.
Added dedicated water line and circuit for coffee wow auto clean system.
Add glycol chiller and nitrogen generator for nitro coffee.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/20/2025 | COMMERCIAL REVIEW - LIMITED v.1 | 03/10/2025 | APPROVED |
Conditions
Permit Number - TC-COM-0225-00331
Permit Status: Complete
Permit Description: Coffee Wow Phase 2: Updated equipment and millwork to existing coffee bar.
Installation of new drain manifold serving the coffee bar.
Added dedicated water line and circuit for coffee wow auto clean system.
Add glycol chiller and nitrogen generator for nitro coffee.
| Date | Description | Comments |
|---|---|---|
| 02/20/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0225-00331
Permite Description: Coffee Wow Phase 2: Updated equipment and millwork to existing coffee bar.
Installation of new drain manifold serving the coffee bar.
Added dedicated water line and circuit for coffee wow auto clean system.
Add glycol chiller and nitrogen generator for nitro coffee.
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/08/2025 | BULD - Electrical Clearance | N/A | Not Applicable | |
| 04/08/2025 | COT - LCEL - Electrical Above Ceiling | N/A | Not Applicable | |
| 04/08/2025 | COT - LCME - Mechanical Final | N/A | Not Applicable | |
| 04/08/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0225-00331
Permit Description: Coffee Wow Phase 2: Updated equipment and millwork to existing coffee bar.
Installation of new drain manifold serving the coffee bar.
Added dedicated water line and circuit for coffee wow auto clean system.
Add glycol chiller and nitrogen generator for nitro coffee.
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/07/2025 | TRSP - ROW - Final/Close-Out | Passed | ||
| 04/08/2025 | ENGR Engineering Final | Passed | ||
| 04/08/2025 | COT - LCPL - Plumbing Final | Passed | ||
| 04/08/2025 | COT - LCEL - Electrical Final | Passed | ||
| 04/08/2025 | COT - LCBU - Building Final | Passed | ||
| 04/08/2025 | COT - FCON - Fire - Final | Passed | ||
| 04/09/2025 | COT - LCEL - Electrical Intermediate | Passed | ||
| 04/09/2025 | COT - LCEL - Grounding/Bonding | Passed | ||
| 04/09/2025 | COT - LCPL - Plumbing Intermediate | Passed |