Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Address:
1375 W AJO WY
Address NEW:
1375 W AJO WY
Apply Date:
02/14/2025
Applicant:
Jaris Brenneman
Description:
Coffee Wow Phase 2: Updated equipment and millwork to existing coffee bar. Installation of new drain manifold serving the coffee bar. Added dedicated water line and circuit for coffee wow auto clean system. Add glycol chiller and nitrogen generator for nitro coffee.

Permit Reviews

Permit Number - TC-COM-0225-00324
Permit Status: Complete
Permit Description: Coffee Wow Phase 2: Updated equipment and millwork to existing coffee bar. Installation of new drain manifold serving the coffee bar. Added dedicated water line and circuit for coffee wow auto clean system. Add glycol chiller and nitrogen generator for nitro coffee.
Start Date Submittal Complete Date Status  
03/12/2025 COMMERCIAL REVIEW - LIMITED v.2 03/25/2025 APPROVED Review Details
03/25/2025 RESTAMP - COMMERCIAL v.1 03/26/2025 APPROVED Review Details
02/20/2025 COMMERCIAL REVIEW - LIMITED v.1 03/06/2025 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-COM-0225-00324
Permit Status: Complete
Permit Description: Coffee Wow Phase 2: Updated equipment and millwork to existing coffee bar. Installation of new drain manifold serving the coffee bar. Added dedicated water line and circuit for coffee wow auto clean system. Add glycol chiller and nitrogen generator for nitro coffee.
Date Description Comments
03/26/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
02/20/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0225-00324
Permite Description: Coffee Wow Phase 2: Updated equipment and millwork to existing coffee bar. Installation of new drain manifold serving the coffee bar. Added dedicated water line and circuit for coffee wow auto clean system. Add glycol chiller and nitrogen generator for nitro coffee.
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
04/14/2025 BULD - Electrical Clearance N/A Not Applicable 4-14-25, not applicable.
04/14/2025 COT - BULD - SWG Clearance N/A Not Applicable 4-14-25, not applicable.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0225-00324
Permit Description: Coffee Wow Phase 2: Updated equipment and millwork to existing coffee bar. Installation of new drain manifold serving the coffee bar. Added dedicated water line and circuit for coffee wow auto clean system. Add glycol chiller and nitrogen generator for nitro coffee.
Total Completed Inspections - 11
Date Description Inspector Results Comments
04/14/2025 COT - LCBU - Building Final Passed 4-14-25, building final approved.
04/14/2025 COT - LCEL - Electrical Final Passed 4-14-25, electrical final approved.
04/14/2025 COT - LCME - Mechanical Final Passed 4-14-25, mechanical final approved.
04/14/2025 COT - LCPL - Plumbing Final Passed 4-14-25, plumbing final approved.
04/14/2025 TRSP - ROW - Final/Close-Out Passed
04/14/2025 COT - FCON - Fire - Final Passed
04/14/2025 ENGR Engineering Final Passed
04/14/2025 COT - LCEL - Electrical Above Ceiling Passed 4-14-25, approved.
04/14/2025 COT - LCPL - Plumbing Intermediate Passed 4-14-25, approved.
04/14/2025 COT - LCEL - Electrical Intermediate Passed 4-14-25, approved.
04/14/2025 COT - LCEL - Grounding/Bonding Passed 4-14-25, approved.

Documents

File Name Document Type  
LOFC_LETTEROFCOMPLETION.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-05-1470 COFFEEWOW PHASE 2 - B2_V2.PDF DOCUMENTS VIEW