Permit: TC-COM-0225-00262
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
5441 E 22ND ST BLDG 3
Address NEW:
5441 E 22ND ST BLDG 3
Apply Date:
02/10/2025
Applicant:
Ben Fyffe
Description:
Additional Application for Master Permit #TC-COM-1224-02319 - Building A -
Permit Reviews
Permit Number - TC-COM-0225-00262
Permit Status: Complete
Permit Description: Additional Application for Master Permit #TC-COM-1224-02319 - Building A -
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/17/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/20/2025 | REQUIRES RESUBMIT |
| 11/10/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/14/2025 | APPROVED |
| 05/05/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 05/05/2025 | REQUIRES RESUBMIT |
| 04/01/2025 | COMMERCIAL REVIEW - FULL v.3 | 04/23/2025 | APPROVED |
| 11/03/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.3 | 11/04/2025 | REQUIRES RESUBMIT |
| 02/13/2025 | COMMERCIAL REVIEW - FULL v.1 | 02/13/2025 | REQUIRES RESUBMIT |
| 04/30/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/01/2025 | REQUIRES RESUBMIT |
| 05/09/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.3 | 05/09/2025 | APPROVED |
| 11/06/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.4 | 11/07/2025 | APPROVED |
| 02/18/2025 | COMMERCIAL REVIEW - FULL v.2 | 03/20/2025 | REQUIRES RESUBMIT |
| 10/28/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 10/28/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0225-00262
Permit Status: Complete
Permit Description: Additional Application for Master Permit #TC-COM-1224-02319 - Building A -
| Date | Description | Comments |
|---|---|---|
| 02/12/2025 | Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 | |
| 10/20/2025 | AIR BALANCING REPORT IS REQUIRED. | |
| 03/12/2025 | SPECIAL INSPECTION OF COLD-FORMED STEEL LIGHT-FRAME CONSTRUCTION IS REQUIRED. | |
| 03/12/2025 | SPECIAL INSPECTION OF CONCRETE CONSTRUCTION IS REQUIRED. | |
| 02/12/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 02/12/2025 | Plan review applications expire 180 days from date of submittal unless the permit has been issued. Permits expire 180 days after issuance or last approved inspection. | |
| 03/12/2025 | SPECIAL INSPECTION OF FABRICATORS IS REQUIRED. | |
| 03/12/2025 | SPECIAL INSPECTION OF MASONRY CONSTRUCTION IS REQUIRED. | |
| 03/05/2025 | SPECIAL INSPECTION FOR OUTDOOR LIGHTING IS REQUIRED. | |
| 03/12/2025 | SPECIAL INSPECTION OF POST-INSTALLED ANCHORS IS REQUIRED. | |
| 02/13/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 03/12/2025 | SPECIAL INSPECTION INSPECTION OF SOILS IS REQUIRED. | |
| 02/12/2025 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0225-00262
Permite Description: Additional Application for Master Permit #TC-COM-1224-02319 - Building A -
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/05/2025 | COT - LCBU - Framing | N/A | Partial Pass | Pending electrical completion |
| 10/20/2025 | COT - LCEL - Electrical Above Ceiling | N/A | Not Applicable | |
| 11/18/2025 | FCON – Fire – Intermediate | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0225-00262
Permit Description: Additional Application for Master Permit #TC-COM-1224-02319 - Building A -
Total Completed Inspections - 20
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/09/2025 | COT - LCBU - Masonry Pregrout | Passed | ||
| 08/06/2025 | COT - LCBU - Excavation/Rebar/Zoning | Passed | ||
| 08/06/2025 | COT - LCBU - Preslab | Passed | ||
| 08/06/2025 | COT - HCBU - Stem Wall/Retaining Wall | Passed | ||
| 08/15/2025 | COT - HCBU - Firewall/Fire Barrier/Firestop | Passed | Walls insulated and taped. | |
| 10/20/2025 | COT - LCEL - Electrical Intermediate | Passed | ||
| 10/20/2025 | COT - LCBU - Framing | Passed | ||
| 10/20/2025 | COT - LCEL - Electrical Underground | Passed | ||
| 10/20/2025 | COT - LCEL - Outdoor Lighting | Passed | ||
| 10/20/2025 | COT - HCBU - Exterior Clips/Sheathing | Passed | ||
| 10/20/2025 | COT - LCBU - Roof Nailing | Passed | ||
| 10/20/2025 | COT - LCEL - Grounding/Bonding | Passed | ||
| 10/20/2025 | COT - HCBU - Interior Shear Bracing | Passed | ||
| 10/17/2025 | COT - FCON - Alarm - Final | Passed | Passed by C Basaldua 10/14/2025 | |
| 10/17/2025 | COT - FCON - Fire - Final | Passed | Passed by C Basaldua 10/14/2025 | |
| 10/17/2025 | COT - LCBU - Building Final | Passed | ||
| 10/17/2025 | COT - LCEL - Electrical Final | Passed | ||
| 10/17/2025 | ENGR Engineering Final | Passed | Site is complete in accordance with approved plans. Buildings are safe and accessible. Engineering is okay for CofO. | |
| 11/04/2025 | COT - FCON - Sprinkler - Final | Passed | ||
| 11/04/2025 | TRSP - ROW - Final/Close-Out | Passed |