Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
02/06/2025
Applicant:
Melody Mao
Description:
TI - remodel of (E) space including doors, partitions, ceilings, lighting, fixtures, shelving, etc. MEP work. Storefront is (E) and to remain “ as is”. Change of use from "B" to "M".

Permit Reviews

Permit Number - TC-COM-0225-00249
Permit Status: Complete
Permit Description: TI - remodel of (E) space including doors, partitions, ceilings, lighting, fixtures, shelving, etc. MEP work. Storefront is (E) and to remain “ as is”. Change of use from "B" to "M".
Start Date Submittal Complete Date Status  
02/08/2025 COMMERCIAL REVIEW - FULL v.1 03/07/2025 APPROVED Review Details

Conditions

Permit Number - TC-COM-0225-00249
Permit Status: Complete
Permit Description: TI - remodel of (E) space including doors, partitions, ceilings, lighting, fixtures, shelving, etc. MEP work. Storefront is (E) and to remain “ as is”. Change of use from "B" to "M".
Date Description Comments
03/17/2025 The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account.
02/08/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
02/08/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0225-00249
Permite Description: TI - remodel of (E) space including doors, partitions, ceilings, lighting, fixtures, shelving, etc. MEP work. Storefront is (E) and to remain “ as is”. Change of use from "B" to "M".
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
06/02/2025 COT - BULD - SWG Clearance N/A Not Applicable
06/23/2025 COT - HCBU - Building Above Ceiling N/A Partial Pass 6-23-25: partial pass-install condensation lines for HVAC.
07/30/2025 BULD - Electrical Clearance N/A Not Applicable
06/23/2025 COT - HCEL - Electrical Progress N/A Partial Pass 6-23-25: verified per plans. Work is continuous-label all above ceiling junction boxes. Okay to continue work at progress areas.
06/23/2025 COT - HCME - Mechanical Progress N/A Partial Pass 6-23-25: verified per plans. Okay to continue construction at progress areas.
06/23/2025 COT - HCPL - Plumbing Above Ceiling N/A Partial Pass 6-23-25: verified per plans. Insulate/wrap hot copper lines-provide pictures for in wall domestic and okay to continue with construction at progress areas.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0225-00249
Permit Description: TI - remodel of (E) space including doors, partitions, ceilings, lighting, fixtures, shelving, etc. MEP work. Storefront is (E) and to remain “ as is”. Change of use from "B" to "M".
Total Completed Inspections - 17
Date Description Inspector Results Comments
05/23/2025 COT - HCEL - Electrical Intermediate Passed
05/23/2025 COT - HCBU - Framing Passed
06/03/2025 COT - HCPL - Rough Soil Passed
06/04/2025 COT - HCEL - Electrical Underground Passed
07/11/2025 COT - HCBU - Building Above Ceiling Passed
07/25/2025 TRSP - ROW - Final/Close-Out Passed Work is on private property
07/29/2025 COT - HCPL - Plumbing Final Passed
07/29/2025 COT - HCPL - Plumbing Intermediate Passed
07/29/2025 COT - HCEL - Electrical Final Passed
07/30/2025 COT - HCBU - Building Final Passed
07/30/2025 COT - HCEL - Electrical Progress Passed
07/30/2025 COT - HCME - Mechanical Intermediate Passed
07/30/2025 COT - HCME - Mechanical Progress Passed
07/30/2025 COT - HCPL - Plumbing Above Ceiling Passed
07/31/2025 COT - FCON - Fire - Final Passed
08/01/2025 ENGR Engineering Final Passed Contractor replaced Units numbers above front entrance with correct 4” numbers. All work to be complete today and dumpsters/porta-potty have been removed.
08/01/2025 COT - HCME - Mechanical Final Passed