Permit Details

Status:
Issued
Type:
Commercial Building
Apply Date:
02/29/2024
Applicant:
Kelly Rehm
Description:
ENCANTADA LA ESTANCIA PV SYSTEM* WILL CONSIST OF 69 SILFAB 500W MODULES WITH (4) GRID-TIED INVERTERS. ALL MODULES WILL BE MOUNTED ON A NEW CUSTOM STEEL PARKING CANOPY. *Structural portion only. Electrical design will be submitted as a revision.

Permit Reviews

Permit Number - TC-COM-0224-00388
Permit Status: Issued
Permit Description: ENCANTADA LA ESTANCIA PV SYSTEM* WILL CONSIST OF 69 SILFAB 500W MODULES WITH (4) GRID-TIED INVERTERS. ALL MODULES WILL BE MOUNTED ON A NEW CUSTOM STEEL PARKING CANOPY. *Structural portion only. Electrical design will be submitted as a revision.
Start Date Submittal Complete Date Status  
04/18/2024 RESTAMP - COMMERCIAL v.1 04/22/2024 APPROVED Review Details
04/08/2024 COMMERCIAL REVIEW - FULL v.2 04/18/2024 APPROVED Review Details
06/20/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/21/2024 APPROVED Review Details
03/01/2024 COMMERCIAL REVIEW - FULL v.1 04/03/2024 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0224-00388
Permit Status: Issued
Permit Description: ENCANTADA LA ESTANCIA PV SYSTEM* WILL CONSIST OF 69 SILFAB 500W MODULES WITH (4) GRID-TIED INVERTERS. ALL MODULES WILL BE MOUNTED ON A NEW CUSTOM STEEL PARKING CANOPY. *Structural portion only. Electrical design will be submitted as a revision.
Total Outstanding Activity Conditions - 1
Date Name
04/02/2024 SPECIAL INSPECTION FOR FABRICATORS IS REQUIRED

Conditions

Permit Number - TC-COM-0224-00388
Permit Status: Issued
Permit Description: ENCANTADA LA ESTANCIA PV SYSTEM* WILL CONSIST OF 69 SILFAB 500W MODULES WITH (4) GRID-TIED INVERTERS. ALL MODULES WILL BE MOUNTED ON A NEW CUSTOM STEEL PARKING CANOPY. *Structural portion only. Electrical design will be submitted as a revision.
Date Description Comments
04/22/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
04/22/2024 SPECIAL INSPECTION FOR PILING, DRILLED PIERS AND CAISSONS IS REQUIRED.
04/02/2024 SPECIAL INSPECTION FOR COLD-FORMED STEEL FRAMING IS REQUIRED
04/02/2024 SPECIAL INSPECTION FOR PLACEMENT OF ANCHOR RODS AND OTHER EMBEDMENTSSUPPORTING STRUCTURAL STEEL IS REQUIRED

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-COM-0224-00388
Permite Description: ENCANTADA LA ESTANCIA PV SYSTEM* WILL CONSIST OF 69 SILFAB 500W MODULES WITH (4) GRID-TIED INVERTERS. ALL MODULES WILL BE MOUNTED ON A NEW CUSTOM STEEL PARKING CANOPY. *Structural portion only. Electrical design will be submitted as a revision.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
07/15/2024 COT - CSOL - Outdoor Lighting Solar Project N/A Not Applicable

Completed Inspections

Permit Status: Issued
Permit Number: TC-COM-0224-00388
Permit Description: ENCANTADA LA ESTANCIA PV SYSTEM* WILL CONSIST OF 69 SILFAB 500W MODULES WITH (4) GRID-TIED INVERTERS. ALL MODULES WILL BE MOUNTED ON A NEW CUSTOM STEEL PARKING CANOPY. *Structural portion only. Electrical design will be submitted as a revision.
Total Completed Inspections - 10
Date Description Inspector Results Comments
06/04/2024 COT - LCBU - Excavation/Rebar/Zoning Passed
07/15/2024 COT - CSOL - Electrical Final Solar Project Passed Approved solar structure - DGC Clearance to TEP is required for the solar meter
* Pending approval of other departments *
07/15/2024 COT - LCBU - Building Final Passed Approved solar structure - DGC Clearance to TEP is required for the solar meter
* Pending approval of other departments *
07/15/2024 COT - LCEL - Electrical Final Passed
07/15/2024 ENGR Engineering Final Passed Solar parking structure only
07/15/2024 TRSP - ROW - Final/Close-Out Passed no work in row
07/15/2024 COT - CSOL - Electrical Progress Solar Project Passed
07/15/2024 COT - CSOL - Electrical Underground Solar Project Passed
07/15/2024 COT - CSOL - Grounding/Bonding Solar Project Passed
07/15/2024 BULD - Electrical Clearance Passed Approved solar structure - DGC Clearance to TEP is required for the solar meter

Documents

File Name Document Type  
ENCANTADA LA ESTANCIA PV 34.5KW - FINAL SI FORM-2024-06-20_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
124036 ENCANTADA LA ESTANCIA PV CANOPY CALC PACKAGE_V2.PDF DOCUMENTS VIEW
CONS-ENCANTADA LA ESTANCIA PV 34.5KW - FULL PLAN SET_V2.PDF DOCUMENTS VIEW
ENCANTADA LA ESTANCIA PV 34.5KW - INITIAL SI FORM-2024-04-05_V1.PDF DOCUMENTS VIEW
ENCANTADA LA ESTANCIA PV 34.5KW - SPEC SHEETS_V1.PDF DOCUMENTS VIEW