Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-COM-0224-00340
Permit Details
Apply Date:
02/21/2024
Applicant:
Brad Leto
Description:
A Structural Damage repair.
Permit Reviews
Permit Number - TC-COM-0224-00340
Permit Status: Complete
Permit Description: A Structural Damage repair.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/27/2024 | COMMERCIAL REVIEW - FULL v.1 | 02/27/2024 | REQUIRES RESUBMIT |
02/27/2024 | COMMERCIAL REVIEW - LIMITED v.1 | 03/15/2024 | APPROVED |
Conditions
Permit Number - TC-COM-0224-00340
Permit Status: Complete
Permit Description: A Structural Damage repair.
Date | Description | Comments |
---|---|---|
03/15/2024 | The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account. | |
03/14/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0224-00340
Permite Description: A Structural Damage repair.
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/02/2024 | BULD - Electrical Clearance | N/A | Not Applicable | |
04/19/2024 | COT - FCON - Fire - Final | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0224-00340
Permit Description: A Structural Damage repair.
Total Completed Inspections - 7
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/02/2024 | COT - LCBU - Roof Nailing | Passed | ||
04/04/2024 | COT - LCBU - Framing | Passed | ||
04/04/2024 | COT - HCEL - Electrical Intermediate | Passed | 4/4/24: rips and holes in vapor barrier must be caulked before gyp board installation | |
04/09/2024 | COT - BULD - SWG Clearance | Passed | 4/9/24: lath inspection ok to proceed with insulation and drywall. | |
04/19/2024 | COT - LCBU - Building Final | Passed | ||
04/19/2024 | COT - LCEL - Electrical Final | Passed | ||
04/19/2024 | COT - LCME - Mechanical Final | Passed |