Permit: TC-COM-0224-00269
Permit Details
Apply Date:
02/08/2024
Applicant:
Frank Falesch
Description:
Interior Tenant Improvements to a Tint World
Permit Reviews
Permit Number - TC-COM-0224-00269
Permit Status: Complete
Permit Description: Interior Tenant Improvements to a Tint World
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/08/2024 | COMMERCIAL REVIEW - FULL v.1 | 03/18/2024 | APPROVED |
09/27/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/30/2024 | APPROVED |
Conditions
Permit Number - TC-COM-0224-00269
Permit Status: Complete
Permit Description: Interior Tenant Improvements to a Tint World
Date | Description | Comments |
---|---|---|
02/13/2024 | AIR BALANCING/COMMISSIONING REPORT IS REQUIRED. | |
09/25/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
02/13/2024 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0224-00269
Permite Description: Interior Tenant Improvements to a Tint World
Total Outstanding Inspections - 8
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/17/2024 | COT - HCEL - Electrical Progress | N/A | Partial Pass | 5/17/24: electrical underground okaynto backfill |
07/12/2024 | COT - HCBU - Building Progress | N/A | Not Applicable | |
07/12/2024 | COT - HCME - Mechanical Above Ceiling | N/A | Partial Pass | 8/7/24 Please install soffit as required and block in IKU's and return boxes Ok to cover all other areas |
07/12/2024 | COT - HCEL - Electrical Above Ceiling | N/A | Partial Pass | |
08/07/2024 | COT - HCME - Mechanical Progress | N/A | Partial Pass | 8/7/24 Please install soffit as required and block in IKU's and return boxes Ok to cover all other areas |
05/17/2024 | COT - HCPL - Plumbing Progress | N/A | Partial Pass | 5/17/24: plumbing underground okay to backfill |
09/19/2024 | ENGR Engineering Final | N/A | Partial Pass | The contractor is going to reconstruct the ramp just north of the front door to be incompliant OK for level 4 T C OF O |
09/19/2024 | COT - FCON - Fire - Final | N/A | Partial Pass | Front exit sign and exit discharge EM lighting |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0224-00269
Permit Description: Interior Tenant Improvements to a Tint World
Total Completed Inspections - 20
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/12/2024 | COT - HCEL - Electrical Progress | Passed | ||
07/12/2024 | COT - HCPL - Plumbing Above Ceiling | Passed | ||
08/09/2024 | COT - HCBU - Framing | Passed | ||
08/09/2024 | COT - HCME - Mechanical Above Ceiling | Passed | ||
08/09/2024 | COT - HCEL - Electrical Above Ceiling | Passed | ||
08/09/2024 | COT - HCME - Mechanical Progress | Passed | ||
08/09/2024 | COT - HCPL - Plumbing Progress | Passed | ||
08/09/2024 | COT - HCPL - Rough Soil | Passed | ||
08/29/2024 | BULD - Electrical Clearance | Passed | ||
08/29/2024 | COT - HCEL - Grounding/Bonding | Passed | ||
09/17/2024 | COT - HCEL - Electrical Final | Passed | ||
09/17/2024 | COT - HCME - Venting | Passed | ||
09/17/2024 | COT - HCME - Mechanical Final | Passed | ||
09/17/2024 | COT - HCPL - Plumbing Final | Passed | ||
09/18/2024 | COT - HCBU - Building Final | Passed | ||
09/18/2024 | COT - HCBU - CofO | Passed | ||
09/19/2024 | COT - HCBU - Building Above Ceiling | Passed | ||
09/19/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
09/23/2024 | ENGR Engineering Final | Passed | ||
09/24/2024 | COT - FCON - Fire - Final | Passed |