Permit: TC-COM-0224-00268
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
6347 S FONTANA AV UNIT 18
Address NEW:
6347 S FONTANA AV UNIT 18
Apply Date:
02/08/2024
Applicant:
Description:
“Each unit is existing, there are no new units or buildings”. Per the electrical plans "E" electrical service is being shown here along the “verification of the address” are included, Service is to ensure the meter clearances are accepted and approved by the electrical utility (TEP). Each service "A, B, C, D and E”, which required its individual permit and is being represented as such. ‘Electrical Pedestals are being installed in place of the existing poles and connected to each of the 28 ‘Existing Units’ sub-meters.
Permit Reviews
Permit Number - TC-COM-0224-00268
Permit Status: Complete
Permit Description: “Each unit is existing, there are no new units or buildings”. Per the electrical plans "E" electrical service is being shown here along the “verification of the address” are included, Service is to ensure the meter clearances are accepted and approved by the electrical utility (TEP). Each service "A, B, C, D and E”, which required its individual permit and is being represented as such. ‘Electrical Pedestals are being installed in place of the existing poles and connected to each of the 28 ‘Existing Units’ sub-meters.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/12/2024 | COMMERCIAL PDSD SIMPLE REVIEW v.1 | 02/15/2024 | APPROVED |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0224-00268
Permit Description: “Each unit is existing, there are no new units or buildings”. Per the electrical plans "E" electrical service is being shown here along the “verification of the address” are included, Service is to ensure the meter clearances are accepted and approved by the electrical utility (TEP). Each service "A, B, C, D and E”, which required its individual permit and is being represented as such. ‘Electrical Pedestals are being installed in place of the existing poles and connected to each of the 28 ‘Existing Units’ sub-meters.
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/23/2024 | COT - LCEL - Electrical Underground | Passed | 2/23/24: electrical underground per plan, grounding at pedestals passed. | |
| 09/06/2024 | BULD - Electrical Clearance | Passed | Approved new 200A service panel "E" - ECO Clearance to TEP is required for panel E (future use) | |
| 10/21/2024 | COT - LCEL - Electrical Final | Passed | ||
| 10/21/2024 | COT - LCEL - Electrical Intermediate | Passed | ||
| 10/21/2024 | COT - LCEL - Electrical Progress | Passed | ||
| 10/21/2024 | COT - LCEL - Grounding/Bonding | Passed |