Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Address NEW:
25 E BLACKLIDGE DR
Apply Date:
02/07/2024
Applicant:
Description:
Renovation of existing building for a marijuana dispensary.

Permit Reviews

Permit Number - TC-COM-0224-00255
Permit Status: Complete
Permit Description: Renovation of existing building for a marijuana dispensary.
Start Date Submittal Complete Date Status  
12/12/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.2 12/12/2024 APPROVED Review Details
04/02/2024 RESTAMP - COMMERCIAL v.1 04/08/2024 APPROVED Review Details
12/06/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/09/2024 APPROVED Review Details
10/02/2024 COMMERCIAL REVIEW - FULL v.1 10/04/2024 APPROVED Review Details
03/25/2024 COMMERCIAL REVIEW - FULL v.2 04/01/2024 REQUIRES RESUBMIT Review Details
12/11/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/12/2024 REQUIRES RESUBMIT Review Details
02/07/2024 COMMERCIAL REVIEW - FULL v.1 03/19/2024 REQUIRES RESUBMIT Review Details
04/01/2024 COMMERCIAL REVIEW - FULL v.3 04/02/2024 APPROVED Review Details

Conditions

Permit Number - TC-COM-0224-00255
Permit Status: Complete
Permit Description: Renovation of existing building for a marijuana dispensary.
Date Description Comments
04/01/2024 AIR BALANCING REPORT IS REQUIRED.
04/01/2024 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
04/01/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
02/07/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
04/01/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
04/01/2024 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
04/01/2024 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
04/01/2024 Post-Installed Anchor Inspection Report is required.
04/01/2024 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0224-00255
Permite Description: Renovation of existing building for a marijuana dispensary.
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
09/30/2024 COT - HCPL - Sewer N/A Not Ready Sewer line not ready. Line system is too low to connect with main line; line must be raised. Will recall when corrections are effected.
12/06/2024 COT - HCPL - Backwater Valve N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0224-00255
Permit Description: Renovation of existing building for a marijuana dispensary.
Total Completed Inspections - 27
Date Description Inspector Results Comments
10/09/2024 COT - HCBU - Excavation/Rebar/Zoning Passed
10/09/2024 COT - HCPL - Rough Soil Passed
10/09/2024 COT - HCBU - Preslab Passed
10/09/2024 COT - HCBU - Masonry Pregrout Passed
10/14/2024 COT - HCBU - Roof Nailing Passed
10/14/2024 COT - HCEL - Grounding/Bonding Passed
10/14/2024 COT - HCPL - Yard Water Line Passed
10/14/2024 BULD - Electrical Clearance Passed
10/18/2024 COT - HCME - Mechanical Intermediate Passed
10/18/2024 COT - HCME - Mechanical Above Ceiling Passed
10/18/2024 COT - HCPL - Plumbing Above Ceiling Passed
10/18/2024 COT - HCPL - Plumbing Intermediate Passed
10/21/2024 COT - HCEL - Electrical Above Ceiling Passed
10/21/2024 COT - HCBU - Framing Passed
10/21/2024 COT - HCEL - Electrical Intermediate Passed Partial approval for all except the service sub panel wall At panels
11/04/2024 COT - HCPL - Sewer Passed 11/4/2024 tied in to main line. Okay to backfill. Shading required.
11/21/2024 COT - HCEL - Electrical Underground Passed 4 light pole bases ok to place concrete
12/06/2024 COT - HCPL - Plumbing Final Passed
12/06/2024 COT - HCME - Mechanical Final Passed
12/06/2024 COT - HCEL - Electrical Final Passed
12/06/2024 COT - HCBU - Building Final Passed
12/06/2024 COT - HCBU - Building Above Ceiling Passed
12/06/2024 TRSP - ROW - Final/Close-Out Passed
12/06/2024 ENGR Engineering Final Passed okay for full C of O. DP as-built required.
12/06/2024 COT - FCON - Fire - Final Passed
12/06/2024 COT - HCEL - Outdoor Lighting Passed
12/06/2024 COT - HCPL - Plumbing Roof Drains Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
BACTERIAL REPORT PHILLIP'S PLUMBING-2024-12-02_V1.PDF DOCUMENTS VIEW
TC-COM-0224-00255-PONDEROSA SPECIAL INSPECTION FINAL-2024-12-06_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
240925 - PONDEROSADISPENSARY - REVISED_COMBINED_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-D_HALO-CDS_SUBMITTAL 3_V3.PDF DOCUMENTS VIEW
M_HALO-ODOR MITIGATION HVAC SYSTEM NARRATIVE_V1.PDF DOCUMENTS VIEW
HALO-FAUCET CUT SHEET_SUBMITTAL 3_V1.PDF DOCUMENTS VIEW
HALO-SPECIAL INSPECTION CERTIFICATE_SUBMITTAL 3_V1.PDF DOCUMENTS VIEW
M_HALO-MECH IECC - HVAC LOAD CALCS_SUBMITTAL 3_V1.PDF DOCUMENTS VIEW
SC_HALO-STRUCTURAL CALCS_SUBMITTAL 3_V1.PDF DOCUMENTS VIEW