Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-COM-0224-00238
Permit Details
Apply Date:
02/05/2024
Applicant:
Michael Sandquist
Description:
Upgrade existing temporary electrical service to 200 amp permanent service entrance on pole. (Service line has been temporary since 2021 when TEP pole was damaged. Pole has been replaced and is ready for permanent service drop to serve this property) LIKE FOR LIKE REPLACEMENT (Per applicant)
Permit Reviews
Permit Number - TC-COM-0224-00238
Permit Status: Issued
Permit Description: Upgrade existing temporary electrical service to 200 amp permanent service entrance on pole. (Service line has been temporary since 2021 when TEP pole was damaged. Pole has been replaced and is ready for permanent service drop to serve this property)
LIKE FOR LIKE REPLACEMENT (Per applicant)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/06/2024 | COMMERCIAL PDSD SIMPLE REVIEW v.1 | 02/21/2024 | APPROVED |
Conditions
Permit Number - TC-COM-0224-00238
Permit Status: Issued
Permit Description: Upgrade existing temporary electrical service to 200 amp permanent service entrance on pole. (Service line has been temporary since 2021 when TEP pole was damaged. Pole has been replaced and is ready for permanent service drop to serve this property)
LIKE FOR LIKE REPLACEMENT (Per applicant)
| Date | Description | Comments |
|---|---|---|
| 02/06/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-COM-0224-00238
Permit Description: Upgrade existing temporary electrical service to 200 amp permanent service entrance on pole. (Service line has been temporary since 2021 when TEP pole was damaged. Pole has been replaced and is ready for permanent service drop to serve this property)
LIKE FOR LIKE REPLACEMENT (Per applicant)
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/01/2024 | BULD - Electrical Clearance | Passed | Approved 200A service panel upgrade, INCR Clearance to TEP is required for the cutover |