Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
02/24/2023
Applicant:
Evan Bowen
Description:
(Shell & Core) THIS PORTION OF THE PROJECT IS ONLY THE BUILDING ENVELOPE PACKAGE FOR A PRE-ENGINEERED METAL BUIDLING. A TENANT IMPROVEMENT PACKAGE FOR THE INTERIOR BUILD-OUT WILL BE PERMITTED IN A SEPARATE PACKAGE.

Permit Reviews

Permit Number - TC-COM-0223-00714
Permit Status: Complete
Permit Description: (Shell & Core) THIS PORTION OF THE PROJECT IS ONLY THE BUILDING ENVELOPE PACKAGE FOR A PRE-ENGINEERED METAL BUIDLING. A TENANT IMPROVEMENT PACKAGE FOR THE INTERIOR BUILD-OUT WILL BE PERMITTED IN A SEPARATE PACKAGE.
Start Date Submittal Complete Date Status  
06/20/2023 RESTAMP - COMMERCIAL v.1 06/20/2023 APPROVED Review Details
07/24/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/25/2024 APPROVED Review Details
03/06/2023 COMMERCIAL REVIEW - FULL v.1 04/05/2023 REQUIRES RESUBMIT Review Details
06/08/2023 COMMERCIAL REVIEW - FULL v.2 06/14/2023 REQUIRES RESUBMIT Review Details
06/15/2023 COMMERCIAL REVIEW - FULL v.3 06/20/2023 APPROVED Review Details

Conditions

Permit Number - TC-COM-0223-00714
Permit Status: Complete
Permit Description: (Shell & Core) THIS PORTION OF THE PROJECT IS ONLY THE BUILDING ENVELOPE PACKAGE FOR A PRE-ENGINEERED METAL BUIDLING. A TENANT IMPROVEMENT PACKAGE FOR THE INTERIOR BUILD-OUT WILL BE PERMITTED IN A SEPARATE PACKAGE.
Date Description Comments
07/23/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0223-00714
Permite Description: (Shell & Core) THIS PORTION OF THE PROJECT IS ONLY THE BUILDING ENVELOPE PACKAGE FOR A PRE-ENGINEERED METAL BUIDLING. A TENANT IMPROVEMENT PACKAGE FOR THE INTERIOR BUILD-OUT WILL BE PERMITTED IN A SEPARATE PACKAGE.
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
07/18/2023 COT - HCEL - Electrical Intermediate N/A Partial Pass
06/25/2024 COT - BULD - SWG Clearance N/A Not Applicable
06/25/2024 BULD - Electrical Clearance N/A Not Applicable
06/25/2024 COT - HCBU - Building Progress N/A Not Applicable
06/25/2024 COT - HCEL - Electrical Above Ceiling N/A Not Applicable
07/23/2024 COT - FCON - Fire - Final N/A Partial Pass Pending approval from AZSFM (provide inspection report)

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0223-00714
Permit Description: (Shell & Core) THIS PORTION OF THE PROJECT IS ONLY THE BUILDING ENVELOPE PACKAGE FOR A PRE-ENGINEERED METAL BUIDLING. A TENANT IMPROVEMENT PACKAGE FOR THE INTERIOR BUILD-OUT WILL BE PERMITTED IN A SEPARATE PACKAGE.
Total Completed Inspections - 10
Date Description Inspector Results Comments
06/21/2024 COT - HCEL - Electrical Intermediate Passed Inspection regarding shell only. T.I on a separate permit. 6/21/2024
06/25/2024 COT - HCBU - Framing Passed
06/25/2024 COT - HCBU - Building Above Ceiling Passed
06/25/2024 COT - HCBU - Firewall/Fire Barrier/Firestop Passed
06/25/2024 TRSP - ROW - Final/Close-Out Passed
06/25/2024 COT - HCEL - Electrical Final Passed
06/25/2024 ENGR Engineering Final Passed This was for shell only, no exterior work is being completed on this permit
07/11/2024 COT - HCBU - Building Final Passed
07/11/2024 COT - HCBU - CofO Passed
07/25/2024 COT - FCON - Fire - Final Passed See state fire marshal's report (attathed to permit)

Documents

File Name Document Type  
LOFC_LETTEROFCOMPLETION.PDF DOCUMENTS VIEW
SATE FIRE MARSHALL - JTED INNOVATIVE LEARNING CENTER THE BRIDGES - JULY 24, 2024 REPORT_V1.PDF DOCUMENTS VIEW
STATE FIRE MARCHALL FINAL_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
UTILITY PLAN EXHIBIT_V1.PDF DOCUMENTS VIEW
JTED-II_DP_V1.PDF DOCUMENTS VIEW
JTED-II-BLDG-ENVELOPE-RESUBMITTAL_V2_V1.PDF DOCUMENTS VIEW
MTL-BLDG_DEFERRED-SUBMITTAL_V1.PDF DOCUMENTS VIEW