Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Commercial Building
Apply Date:
01/29/2026
Applicant:
Annette Suarez
Description:
restroom addition within an existing 2961 sf office

Permit Reviews

Permit Number - TC-COM-0126-00138
Permit Status: Issued
Permit Description: restroom addition within an existing 2961 sf office
Start Date Submittal Complete Date Status  
03/20/2026 ADMINISTRATIVE v.1 03/20/2026 REQUIRES RESUBMIT Review Details
02/03/2026 COMMERCIAL REVIEW - FULL v.1 02/18/2026 REQUIRES RESUBMIT Review Details
03/20/2026 COMMERCIAL REVIEW - FULL v.2 03/25/2026 APPROVED Review Details
04/24/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/27/2026 APPROVED Review Details

Conditions

Permit Number - TC-COM-0126-00138
Permit Status: Issued
Permit Description: restroom addition within an existing 2961 sf office
Date Description Comments
02/03/2026 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
02/03/2026 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
03/20/2026 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-COM-0126-00138
Permite Description: restroom addition within an existing 2961 sf office
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
04/24/2026 COT - BULD - SWG Clearance N/A Not Applicable
04/24/2026 COT - HCBU - TCO N/A Not Applicable

Completed Inspections

Permit Status: Issued
Permit Number: TC-COM-0126-00138
Permit Description: restroom addition within an existing 2961 sf office
Total Completed Inspections - 10
Date Description Inspector Results Comments
04/01/2026 COT - HCPL - Rough Soil Passed
04/07/2026 COT - LCEL - Electrical Intermediate Passed
04/07/2026 COT - LCEL - Electrical Above Ceiling Passed
04/07/2026 COT - LCME - Mechanical Intermediate Passed
04/07/2026 COT - LCPL - Plumbing Intermediate Passed
04/24/2026 COT - LCPL - Plumbing Final Passed
04/24/2026 COT - LCBU - Building Final Passed
04/24/2026 COT - LCME - Mechanical Final Passed
04/24/2026 COT - LCEL - Electrical Final Passed
04/24/2026 COT - FCON - Fire - Final Passed

Documents

File Name Document Type  
26D0455 TURNER FINAL 04 21 2026 1529-2026-04-21_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
2_COMMENT RESPONSE_V1.PDF DOCUMENTS VIEW
CONS-2_PLAN SET_V2.PDF DOCUMENTS VIEW