Permit: TC-COM-0126-00094
Permit Details
Apply Date:
01/23/2026
Applicant:
Linc McNitt
Description:
Deenergize power to building. Open 1600amp GE Power Break II breaker in Panel MDS. Remove and replace the bump stop. This kit replaces the stop block assembly and is used with manual charging mechanisms to properly engage the closed position. Close breaker and reenergize building.
Permit Reviews
Permit Number - TC-COM-0126-00094
Permit Status: Complete
Permit Description: Deenergize power to building. Open 1600amp GE Power Break II breaker in Panel MDS. Remove and replace the bump stop. This kit replaces the stop block assembly and is used with manual charging mechanisms to properly engage the closed position. Close breaker and reenergize building.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/04/2026 | ADMINISTRATIVE v.1 | 03/04/2026 | REQUIRES RESUBMIT |
| 01/23/2026 | COMMERCIAL PDSD SIMPLE REVIEW v.1 | 01/26/2026 | REQUIRES RESUBMIT |
| 03/03/2026 | COMMERCIAL PDSD SIMPLE REVIEW v.2 | 03/04/2026 | APPROVED |
Conditions
Permit Number - TC-COM-0126-00094
Permit Status: Complete
Permit Description: Deenergize power to building. Open 1600amp GE Power Break II breaker in Panel MDS. Remove and replace the bump stop. This kit replaces the stop block assembly and is used with manual charging mechanisms to properly engage the closed position. Close breaker and reenergize building.
| Date | Description | Comments |
|---|---|---|
| 01/23/2026 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0126-00094
Permit Description: Deenergize power to building. Open 1600amp GE Power Break II breaker in Panel MDS. Remove and replace the bump stop. This kit replaces the stop block assembly and is used with manual charging mechanisms to properly engage the closed position. Close breaker and reenergize building.
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/03/2026 | COT - LCEL - Electrical Final | Passed | 04/03/2026 Approved per plan, replaced 1600A breaker bump stop. No clearance required. |
|
| 04/03/2026 | BULD - Electrical Clearance | Passed | 04/03/2026 Approved per plan, replaced 1600A breaker bump stop. No clearance required. |