Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Address:
4777 E 29TH ST
Address NEW:
4777 E 29TH ST
Apply Date:
01/23/2026
Applicant:
Linc McNitt
Description:
Deenergize power to building. Open 1600amp GE Power Break II breaker in Panel MDS. Remove and replace the bump stop. This kit replaces the stop block assembly and is used with manual charging mechanisms to properly engage the closed position. Close breaker and reenergize building.

Permit Reviews

Permit Number - TC-COM-0126-00094
Permit Status: Complete
Permit Description: Deenergize power to building. Open 1600amp GE Power Break II breaker in Panel MDS. Remove and replace the bump stop. This kit replaces the stop block assembly and is used with manual charging mechanisms to properly engage the closed position. Close breaker and reenergize building.
Start Date Submittal Complete Date Status  
03/04/2026 ADMINISTRATIVE v.1 03/04/2026 REQUIRES RESUBMIT Review Details
01/23/2026 COMMERCIAL PDSD SIMPLE REVIEW v.1 01/26/2026 REQUIRES RESUBMIT Review Details
03/03/2026 COMMERCIAL PDSD SIMPLE REVIEW v.2 03/04/2026 APPROVED Review Details

Conditions

Permit Number - TC-COM-0126-00094
Permit Status: Complete
Permit Description: Deenergize power to building. Open 1600amp GE Power Break II breaker in Panel MDS. Remove and replace the bump stop. This kit replaces the stop block assembly and is used with manual charging mechanisms to properly engage the closed position. Close breaker and reenergize building.
Date Description Comments
01/23/2026 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0126-00094
Permit Description: Deenergize power to building. Open 1600amp GE Power Break II breaker in Panel MDS. Remove and replace the bump stop. This kit replaces the stop block assembly and is used with manual charging mechanisms to properly engage the closed position. Close breaker and reenergize building.
Total Completed Inspections - 2
Date Description Inspector Results Comments
04/03/2026 COT - LCEL - Electrical Final Passed 04/03/2026
Approved per plan, replaced 1600A breaker bump stop. No clearance required.
04/03/2026 BULD - Electrical Clearance Passed 04/03/2026
Approved per plan, replaced 1600A breaker bump stop. No clearance required.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
26044 COX TUCSON MTC E5.1_V2.PDF DOCUMENTS VIEW
APPROVED 26044 COX TUCSON MTC E5.1_V2.PDF DOCUMENTS VIEW