Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Commercial Building
Address NEW:
1940 E BROADWAY BL
Apply Date:
01/20/2026
Applicant:
Dale Kalbaugh
Description:
Removing 1 (E) non-bearing partition wall and rebuilding a wall about 10' from removed wall. Adding/relocating receptacles and moving/replacing 1 prep sink.

Permit Reviews

Permit Number - TC-COM-0126-00074
Permit Status: Inspections
Permit Description: Removing 1 (E) non-bearing partition wall and rebuilding a wall about 10' from removed wall. Adding/relocating receptacles and moving/replacing 1 prep sink.
Start Date Submittal Complete Date Status  
02/12/2026 ADMINISTRATIVE v.1 02/12/2026 REQUIRES RESUBMIT Review Details
01/21/2026 COMMERCIAL REVIEW - FULL v.1 02/11/2026 APPROVED Review Details
02/13/2026 ADMINISTRATIVE v.2 02/13/2026 APPROVED Review Details

Conditions

Permit Number - TC-COM-0126-00074
Permit Status: Inspections
Permit Description: Removing 1 (E) non-bearing partition wall and rebuilding a wall about 10' from removed wall. Adding/relocating receptacles and moving/replacing 1 prep sink.
Date Description Comments
01/21/2026 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
01/21/2026 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-COM-0126-00074
Permite Description: Removing 1 (E) non-bearing partition wall and rebuilding a wall about 10' from removed wall. Adding/relocating receptacles and moving/replacing 1 prep sink.
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
02/24/2026 COT - LCEL - Electrical Above Ceiling N/A Not Ready Not ready open j boxes throughout. Secure mc cable and light fixtures in place. Seismic wire on opposite ends. 2/24/2026
02/24/2026 COT - LCPL - Plumbing Intermediate N/A Partial Pass Inspection is for underground plumbing for new floor sink and in wall sink. Okay to backfill all progress areas. Shading required. 2/24/2026
02/24/2026 COT - LCBU - Framing N/A Partial Pass Provide shot pins per schedule. Add wall bracing at west end. 2/24/2026
COT - LCEL - Electrical Intermediate N/A Scheduled

Scheduled Inspections

Scheduled Inspections - TC-COM-0126-00074
Status: Inspections
Description: Removing 1 (E) non-bearing partition wall and rebuilding a wall about 10' from removed wall. Adding/relocating receptacles and moving/replacing 1 prep sink.
Scheduled Date Description Entered By Entered Date
02/25/2026 COT - LCBU - Framing Scheduled
02/25/2026 COT - LCEL - Electrical Intermediate Scheduled
For information about today’s scheduled inspections please refer to the PDSD Daily Inspections Dashboards (Desktop) PDSD Daily Inspections Dashboards (Mobile) .

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
CONS-CONSTRUCTION PLANS SAFEWAY 1684 DUG ROOM - FLORAL ALTERATION_V1.PDF DOCUMENTS VIEW