Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Address NEW:
1720 S BRISTOL AV
Apply Date:
01/15/2026
Applicant:
Karl Hess
Description:
Installing new (1,225 sf) 35' x 35' shade canopy at existing Bristol Park

Permit Reviews

Permit Number - TC-COM-0126-00063
Permit Status: Complete
Permit Description: Installing new (1,225 sf) 35' x 35' shade canopy at existing Bristol Park
Start Date Submittal Complete Date Status  
01/16/2026 COMMERCIAL REVIEW - LIMITED v.1 02/03/2026 APPROVED Review Details
02/04/2026 ADMINISTRATIVE v.1 02/04/2026 REQUIRES RESUBMIT Review Details
05/21/2026 SPECIAL INSPECTION REVIEW v.2 05/26/2026 APPROVED Review Details
05/20/2026 SPECIAL INSPECTION REVIEW v.1 05/21/2026 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-COM-0126-00063
Permit Status: Complete
Permit Description: Installing new (1,225 sf) 35' x 35' shade canopy at existing Bristol Park
Date Description Comments
01/30/2026 SPECIAL INSPECTION OF CONCRETE CONSTRUCTION IS REQUIRED.
01/16/2026 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
01/30/2026 SPECIAL INSPECTION OF POST-INSTALLED ANCHORS IS REQUIRED.
01/16/2026 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
01/30/2026 SPECIAL INSPECTION OF SOILS IS REQUIRED.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0126-00063
Permit Description: Installing new (1,225 sf) 35' x 35' shade canopy at existing Bristol Park
Total Completed Inspections - 6
Date Description Inspector Results Comments
06/26/2026 COT - LCBU - Building Final Passed
06/26/2026 COT - LCBU - Excavation/Rebar/Zoning Passed 6.26.26
Contractor failed to request footing inspection with the city. Footing depth, reinforcements were not looked at. However, they have submitted a 3rd party inspection report.
06/26/2026 ENGR Engineering Final Passed Site is safe and complete in accordance with approved plans.
06/30/2026 Passed No sidewalks/flatwork included in this project. Project is complete in accordance with approved plans.
06/30/2026 TRSP - ROW - Final/Close-Out Passed shade structure in place, no impact to right of way, all work completed and approved
06/30/2026 COT - LCBU - Framing Passed 6-30-26: framing approved.

Documents

File Name Document Type  
LOFC_LETTEROFCOMPLETION (SSRS).PDF DOCUMENTS VIEW
BRISTOL PARK - SIC - STAMPED-2026-05-21_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
BRISTOL PARK - INTIAL SIC-2026-01-15_V1.PDF DOCUMENTS VIEW
BRISTOL PARK - SHADE CANOPY - CALCS_V1.PDF DOCUMENTS VIEW
CONS-BRISTOL PARK - SHADE CANOPY - SHOP DRAWINGS_V1.PDF DOCUMENTS VIEW