Permit: TC-COM-0126-00043
Permit Details
Apply Date:
01/11/2026
Applicant:
Arturo Ochoa
Description:
Our technicians were called for a gas line repair at an auto body shop. The pipe repair has been completed with all proper fittings. Now a permit is required to finalize the scope of work.
Permit Reviews
Permit Number - TC-COM-0126-00043
Permit Status: Complete
Permit Description: Our technicians were called for a gas line repair at an auto body shop. The pipe repair has been completed with all proper fittings. Now a permit is required to finalize the scope of work.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/12/2026 | COMMERCIAL PDSD SIMPLE REVIEW v.1 | 01/14/2026 | REQUIRES RESUBMIT |
| 02/06/2026 | COMMERCIAL PDSD SIMPLE REVIEW v.3 | 02/09/2026 | APPROVED |
| 01/14/2026 | COMMERCIAL PDSD SIMPLE REVIEW v.2 | 01/16/2026 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0126-00043
Permit Status: Complete
Permit Description: Our technicians were called for a gas line repair at an auto body shop. The pipe repair has been completed with all proper fittings. Now a permit is required to finalize the scope of work.
| Date | Description | Comments |
|---|---|---|
| 01/12/2026 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0126-00043
Permit Description: Our technicians were called for a gas line repair at an auto body shop. The pipe repair has been completed with all proper fittings. Now a permit is required to finalize the scope of work.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/18/2026 | COT - LCPL - Gas Pressure Test | Passed | ||
| 02/18/2026 | COT - BULD - SWG Clearance | Passed | ||
| 02/20/2026 | COT - LCPL - Gas Final | Passed |