Permit: TC-COM-0126-00040
Permit Details
Status:
Needs Resubmittal
Type:
Commercial Building
Address:
1556 W PRINCE RD
Address NEW:
1556 W PRINCE RD
Apply Date:
01/09/2026
Applicant:
Elias Flake
Description:
Install two new parking canopies in an existing parking lot. Both canopies include a new solar PV system with a total size of 86.0 kW AC. Flowing Wells school district properties are exempt from site plan review.
Permit Reviews
Permit Number - TC-COM-0126-00040
Permit Status: Needs resubmittal
Permit Description: Install two new parking canopies in an existing parking lot. Both canopies include a new solar PV system with a total size of 86.0 kW AC. Flowing Wells school district properties are exempt from site plan review.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/25/2026 | SPECIAL INSPECTION REVIEW v.2 | N/A | IN REVIEW |
| 03/27/2026 | ADMINISTRATIVE v.1 | 03/27/2026 | REQUIRES RESUBMIT |
| 01/09/2026 | COMMERCIAL REVIEW - FULL v.1 | 02/03/2026 | REQUIRES RESUBMIT |
| 03/17/2026 | COMMERCIAL REVIEW - FULL v.2 | 03/25/2026 | APPROVED |
| 09/18/2026 | SPECIAL INSPECTION REVIEW v.1 | 09/18/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-COM-0126-00040
Permit Status: Needs resubmittal
Permit Description: Install two new parking canopies in an existing parking lot. Both canopies include a new solar PV system with a total size of 86.0 kW AC. Flowing Wells school district properties are exempt from site plan review.
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 02/02/2026 | SPECIAL INSPECTION OF CONCRETE CONSTRUCTION IS REQUIRED. |
| 02/02/2026 | SPECIAL INSPECTION OF HIGH STRENGTH BOLTING IS REQUIRED. |
| 02/02/2026 | SPECIAL INSPECTION OF STRUCTURAL FIELD WELDING IS REQUIRED. |
Conditions
Permit Number - TC-COM-0126-00040
Permit Status: Needs resubmittal
Permit Description: Install two new parking canopies in an existing parking lot. Both canopies include a new solar PV system with a total size of 86.0 kW AC. Flowing Wells school district properties are exempt from site plan review.
| Date | Description | Comments |
|---|---|---|
| 01/09/2026 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 01/09/2026 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 03/24/2026 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. | |
| 02/02/2026 | SPECIAL INSPECTION OF STRUCTURAL STEEL IS REQUIRED. |
Outstanding Inspections
Permit Status: Needs Resubmittal
Permit Number: TC-COM-0126-00040
Permite Description: Install two new parking canopies in an existing parking lot. Both canopies include a new solar PV system with a total size of 86.0 kW AC. Flowing Wells school district properties are exempt from site plan review.
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/15/2026 | COT - LCBU - Building Final | N/A | Not Ready | awaiting conditions |
| 09/15/2026 | COT - LCEL - Electrical Final | N/A | Not Ready |
Completed Inspections
Permit Status: Needs Resubmittal
Permit Number: TC-COM-0126-00040
Permit Description: Install two new parking canopies in an existing parking lot. Both canopies include a new solar PV system with a total size of 86.0 kW AC. Flowing Wells school district properties are exempt from site plan review.
Total Completed Inspections - 8
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/29/2026 | COT - LCBU - Excavation/Rebar/Zoning | Passed | ||
| 08/29/2026 | BULD - Electrical Clearance | Passed | 8-29-26: okay to energize-DGC verbal clearance issued to TEP at 1025AM. | |
| 09/09/2026 | COT - LCEL - Outdoor Lighting | Passed | ||
| 09/09/2026 | COT - LCEL - Electrical Intermediate | Passed | ||
| 09/09/2026 | COT - LCBU - Framing | Passed | ||
| 09/10/2026 | TRSP - ROW - Final/Close-Out | Passed | ||
| 09/09/2026 | ENGR Engineering Final | Passed | ||
| 09/15/2026 | COT - LCEL - Electrical Underground | Passed |