Permit: TC-COM-0126-00010
Permit Details
Status:
Issued
Type:
Commercial Building
Address:
3636 N CRAYCROFT RD
Address NEW:
3636 N CRAYCROFT RD
Apply Date:
01/05/2026
Applicant:
Jaris Brenneman
Description:
Includes reorganization of existing kitchen equipment and addition of new fryer units. The existing type 1 hood and wrapped ducts will be replaced with Type 1 new equipment. Rooftop equipment will remain existing.
Permit Reviews
Permit Number - TC-COM-0126-00010
Permit Status: Issued
Permit Description: Includes reorganization of existing kitchen equipment and addition of new fryer units. The existing type 1 hood and wrapped ducts will be replaced with Type 1 new equipment. Rooftop equipment will remain existing.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/06/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/08/2026 | APPROVED |
| 02/11/2026 | COMMERCIAL REVIEW - FULL v.2 | 03/09/2026 | APPROVED |
| 01/07/2026 | COMMERCIAL REVIEW - FULL v.1 | 01/29/2026 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0126-00010
Permit Status: Issued
Permit Description: Includes reorganization of existing kitchen equipment and addition of new fryer units. The existing type 1 hood and wrapped ducts will be replaced with Type 1 new equipment. Rooftop equipment will remain existing.
| Date | Description | Comments |
|---|---|---|
| 01/28/2026 | AIR BALANCING REPORT IS REQUIRED. | |
| 01/07/2026 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 01/07/2026 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-COM-0126-00010
Permite Description: Includes reorganization of existing kitchen equipment and addition of new fryer units. The existing type 1 hood and wrapped ducts will be replaced with Type 1 new equipment. Rooftop equipment will remain existing.
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| COT - FCON - Fire - Final | N/A | Not Ready | ||
| COT - FCON - Hood System - Final | N/A | Not Ready | ||
| COT - LCBU - Preslab | N/A | Scheduled | ||
| TRSP - ROW - Final/Close-Out | N/A | Requested | ||
| ENGR Engineering Final | N/A | Scheduled |
Completed Inspections
Permit Status: Issued
Permit Number: TC-COM-0126-00010
Permit Description: Includes reorganization of existing kitchen equipment and addition of new fryer units. The existing type 1 hood and wrapped ducts will be replaced with Type 1 new equipment. Rooftop equipment will remain existing.
Total Completed Inspections - 12
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/05/2026 | COT - LCEL - Electrical Intermediate | Passed | ||
| 05/05/2026 | COT - LCPL - Plumbing Intermediate | Passed | ||
| 05/05/2026 | COT - LCME - Mechanical Intermediate | Passed | ||
| 05/05/2026 | COT - HCPL - Rough Soil | Passed | ||
| 05/05/2026 | COT - HCME - Kitchen Hood | Passed | ||
| 05/07/2026 | COT - LCEL - Electrical Final | Passed | ||
| 05/07/2026 | COT - LCEL - Electrical Above Ceiling | Passed | ||
| 05/07/2026 | COT - LCME - Mechanical Final | Passed | ||
| 05/07/2026 | COT - LCPL - Plumbing Final | Passed | ||
| 05/18/2026 | COT - FCON - Fire - Final | Passed | ||
| 05/18/2026 | COT - FCON - Hood System - Final | Passed | ||
| 05/19/2026 | COT - LCBU - Building Final | Passed |
Scheduled Inspections
Scheduled Inspections - TC-COM-0126-00010
Status: Issued
Description: Includes reorganization of existing kitchen equipment and addition of new fryer units. The existing type 1 hood and wrapped ducts will be replaced with Type 1 new equipment. Rooftop equipment will remain existing.
| Scheduled Date | Description | Entered By | Entered Date |
|---|---|---|---|
| 05/20/2026 | COT - LCBU - Preslab | Scheduled | |
| 05/20/2026 | ENGR Engineering Final | Scheduled |