Permit: TC-COM-0125-00209
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
3800 W STARR PASS BL BLDG 1
Address NEW:
3800 W STARR PASS BL BLDG 1
Apply Date:
01/31/2025
Applicant:
Heather Newman
Description:
Remodel Existing Starbucks into Marketplace
Permit Reviews
Permit Number - TC-COM-0125-00209
Permit Status: Complete
Permit Description: Remodel Existing Starbucks into Marketplace
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/04/2025 | COMMERCIAL REVIEW - FULL v.1 | 02/28/2025 | REQUIRES RESUBMIT |
| 10/20/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/21/2026 | APPROVED |
| 03/28/2025 | COMMERCIAL REVIEW - FULL v.3 | 04/01/2025 | APPROVED |
| 06/08/2026 | COMMERCIAL REVIEW - FULL REVISION v.1 | 06/25/2026 | APPROVED |
| 04/01/2025 | RESTAMP - COMMERCIAL v.1 | 04/02/2025 | APPROVED |
| 10/22/2026 | SPECIAL INSPECTION REVIEW v.1 | 10/23/2026 | APPROVED |
| 03/17/2025 | COMMERCIAL REVIEW - FULL v.2 | 03/20/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0125-00209
Permit Status: Complete
Permit Description: Remodel Existing Starbucks into Marketplace
| Date | Description | Comments |
|---|---|---|
| 04/01/2025 | AIR BALANCING REPORT IS REQUIRED. | |
| 02/04/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 10/01/2026 | Prior to Final - Required Documents - COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED. | |
| 04/01/2025 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. | |
| 04/01/2025 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. | |
| 04/01/2025 | Post-Installed Anchor Inspection Report is required. | |
| 02/04/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 04/01/2025 | WATER STERILIZATION REPORT IS REQUIRED. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0125-00209
Permit Description: Remodel Existing Starbucks into Marketplace
Total Completed Inspections - 16
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/08/2026 | COT - HCEL - Electrical Above Ceiling | Passed | ||
| 07/08/2026 | COT - HCPL - Plumbing Above Ceiling | Passed | ||
| 07/08/2026 | COT - HCPL - Plumbing Intermediate | Passed | ||
| 07/08/2026 | COT - HCEL - Electrical Intermediate | Passed | ||
| 07/15/2026 | COT - HCME - Mechanical Above Ceiling | Passed | 7-15-26: mechanical above ceiling approved. | |
| 07/15/2026 | COT - HCME - Mechanical Intermediate | Passed | 7-15-26: mechanical above ceiling approved. Okay to cover progress areas. | |
| 10/16/2026 | COT - FCON - Alarm - Final | Passed | ||
| 10/16/2026 | COT - FCON - Fire - Final | Passed | ||
| 10/16/2026 | COT - HCBU - Framing | Passed | ||
| 10/16/2026 | COT - HCBU - Building Above Ceiling | Passed | ||
| 10/16/2026 | COT - FCON - Sprinkler - Final | Passed | ||
| 10/12/2026 | TRSP - ROW - Notice of Completion | Passed | ||
| 10/21/2026 | COT - HCBU - Building Final | Passed | 10/21/26: building final approved-okay to apply for a C of O. | |
| 10/21/2026 | COT - HCEL - Electrical Final | Passed | 10/21/26: electrical final approved. | |
| 10/21/2026 | COT - HCME - Mechanical Final | Passed | 10/21/26: mechanical final approved. | |
| 10/21/2026 | COT - HCPL - Plumbing Final | Passed | 10/21/26: plumbing final approved. |