Permit: TC-COM-0125-00189
Permit Details
Apply Date:
01/29/2025
Applicant:
Description:
THIS PROJECT IS PHASE 2 & 3 (OF 3) FOR THE RENOVATION OF THE EXISTING SECOND LEVEL NORTH INFUSION AREA. THE PHASE 2 & 3 RENOVATION CONSISTS OF 2,710 SF INCLUDING: FINISH UPDATES TO (3) EXISTING EXAM ROOMS AND (1) EXISTING SOILED HOLD ROOM AS WELL AS SELECTIVE DEMOLITION OF INTERIOR PARTITIONS, CEILINGS AND MILLWORK TO CREATE (1) NEW EQUIPMENT ALCOVE, (1) NEW STAFF WORK ROOM, (1) NEW WORKSTATION, AND (7) NEW INFUSION BAYS. THERE WILL BE MECHANICAL, ELECTRICAL AND PLUMBING WORK ASSOCIATED WITH THIS SCOPE. THERE WILL BE NO CHANGE TO THE EXISTING OCCUPANCY OR BUILDING TYPE.
Permit Reviews
Permit Number - TC-COM-0125-00189
Permit Status: Approved
Permit Description: THIS PROJECT IS PHASE 2 & 3 (OF 3) FOR THE RENOVATION OF THE EXISTING SECOND LEVEL NORTH INFUSION AREA. THE PHASE 2 & 3 RENOVATION CONSISTS OF 2,710 SF INCLUDING: FINISH UPDATES TO (3) EXISTING EXAM ROOMS AND (1) EXISTING SOILED HOLD ROOM AS WELL AS SELECTIVE DEMOLITION OF INTERIOR PARTITIONS, CEILINGS AND MILLWORK TO CREATE (1) NEW EQUIPMENT ALCOVE, (1) NEW STAFF WORK ROOM, (1) NEW WORKSTATION, AND (7) NEW INFUSION BAYS. THERE WILL BE MECHANICAL, ELECTRICAL AND PLUMBING WORK ASSOCIATED WITH THIS SCOPE. THERE WILL BE NO CHANGE TO THE EXISTING OCCUPANCY OR BUILDING TYPE.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/01/2025 | COMMERCIAL REVIEW - LIMITED v.1 | 02/19/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-COM-0125-00189
Permit Status: Approved
Permit Description: THIS PROJECT IS PHASE 2 & 3 (OF 3) FOR THE RENOVATION OF THE EXISTING SECOND LEVEL NORTH INFUSION AREA. THE PHASE 2 & 3 RENOVATION CONSISTS OF 2,710 SF INCLUDING: FINISH UPDATES TO (3) EXISTING EXAM ROOMS AND (1) EXISTING SOILED HOLD ROOM AS WELL AS SELECTIVE DEMOLITION OF INTERIOR PARTITIONS, CEILINGS AND MILLWORK TO CREATE (1) NEW EQUIPMENT ALCOVE, (1) NEW STAFF WORK ROOM, (1) NEW WORKSTATION, AND (7) NEW INFUSION BAYS. THERE WILL BE MECHANICAL, ELECTRICAL AND PLUMBING WORK ASSOCIATED WITH THIS SCOPE. THERE WILL BE NO CHANGE TO THE EXISTING OCCUPANCY OR BUILDING TYPE.
Total Outstanding Activity Conditions - 4
Date | Name |
---|---|
02/01/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
02/19/2025 | Applies to All: Deferred submittal documents must be submitted and approved prior to installation of construction elements included in deferred submittal documents. |
02/19/2025 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. |
02/19/2025 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. |