Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Issued
Type:
Commercial Building
Address:
2475 E WATER ST
Address NEW:
2475 E WATER ST
Apply Date:
01/27/2025
Applicant:
David Bradshaw
Description:
Demo existing walls in existing 6937 sq ft office building and install new dropped ceiling 9' above finished floor for an open office floor plan. REV!: Vestibule Addition at Main Entrance

Permit Reviews

Permit Number - TC-COM-0125-00173
Permit Status: Issued
Permit Description: Demo existing walls in existing 6937 sq ft office building and install new dropped ceiling 9' above finished floor for an open office floor plan. REV!: Vestibule Addition at Main Entrance
Start Date Submittal Complete Date Status  
12/01/2025 RESTAMP - COMMERCIAL v.1 12/03/2025 APPROVED Review Details
09/24/2025 COMMERCIAL REVIEW - FULL REVISION v.2 11/04/2025 REQUIRES RESUBMIT Review Details
01/31/2025 COMMERCIAL REVIEW - FULL v.1 02/25/2025 REQUIRES RESUBMIT Review Details
07/11/2025 COMMERCIAL REVIEW - FULL REVISION v.1 07/31/2025 REQUIRES RESUBMIT Review Details
05/01/2025 RESTAMP - COMMERCIAL v.1 05/02/2025 APPROVED Review Details
03/11/2025 COMMERCIAL REVIEW - FULL v.2 04/02/2025 REQUIRES RESUBMIT Review Details
04/12/2025 COMMERCIAL REVIEW - FULL v.3 05/01/2025 APPROVED Review Details
12/03/2025 COMMERCIAL REVIEW - FULL REVISION v.1 12/05/2025 APPROVED Review Details
11/06/2025 COMMERCIAL REVIEW - FULL REVISION v.3 12/01/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0125-00173
Permit Status: Issued
Permit Description: Demo existing walls in existing 6937 sq ft office building and install new dropped ceiling 9' above finished floor for an open office floor plan. REV!: Vestibule Addition at Main Entrance
Total Outstanding Activity Conditions - 2
Date Name
05/01/2025 AIR BALANCING REPORT IS REQUIRED.
05/01/2025 WATER STERILIZATION REPORT IS REQUIRED.

Conditions

Permit Number - TC-COM-0125-00173
Permit Status: Issued
Permit Description: Demo existing walls in existing 6937 sq ft office building and install new dropped ceiling 9' above finished floor for an open office floor plan. REV!: Vestibule Addition at Main Entrance
Date Description Comments
01/31/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
01/31/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-COM-0125-00173
Permite Description: Demo existing walls in existing 6937 sq ft office building and install new dropped ceiling 9' above finished floor for an open office floor plan. REV!: Vestibule Addition at Main Entrance
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
10/10/2025 COT - LCEL - Electrical Intermediate N/A Re-inspection required
10/13/2025 COT - LCEL - Electrical Above Ceiling N/A Partial Pass Partial pass waiting for revision for new plan and permit for TI, ok to drywall restroom area
10/13/2025 COT - LCPL - Plumbing Intermediate N/A Partial Pass

Completed Inspections

Permit Status: Issued
Permit Number: TC-COM-0125-00173
Permit Description: Demo existing walls in existing 6937 sq ft office building and install new dropped ceiling 9' above finished floor for an open office floor plan. REV!: Vestibule Addition at Main Entrance
Total Completed Inspections - 4
Date Description Inspector Results Comments
08/28/2025 COT - LCBU - Preslab Passed
08/28/2025 COT - LCPL - Rough Soil Passed
10/10/2025 COT - LCBU - Framing Passed
05/28/2026 COT - LCBU - Excavation/Rebar/Zoning Passed