Permit: TC-COM-0125-00155
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
6138 S NOGALES HY
Address NEW:
6138 S NOGALES HY
Apply Date:
01/23/2025
Applicant:
James Gibbs
Description:
1. Delete existing service 2. Install 200a meter with 200a feed thru breaker only on utility pole. 3. Conduit underground 175’ to existing sub panel location 4. Install new 200a main breaker sub panel at same location 5. Add grounding as required.
Permit Reviews
Permit Number - TC-COM-0125-00155
Permit Status: Complete
Permit Description: 1. Delete existing service
2. Install 200a meter with 200a feed thru breaker only on utility pole.
3. Conduit underground 175’ to existing sub panel location
4. Install new 200a main breaker sub panel at same location
5. Add grounding as required.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/24/2025 | COMMERCIAL PDSD SIMPLE REVIEW v.1 | 01/30/2025 | REQUIRES RESUBMIT |
| 04/14/2025 | COMMERCIAL PDSD SIMPLE REVIEW v.3 | 04/14/2025 | APPROVED |
| 04/08/2025 | COMMERCIAL PDSD SIMPLE REVIEW v.2 | 04/08/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0125-00155
Permit Status: Complete
Permit Description: 1. Delete existing service
2. Install 200a meter with 200a feed thru breaker only on utility pole.
3. Conduit underground 175’ to existing sub panel location
4. Install new 200a main breaker sub panel at same location
5. Add grounding as required.
| Date | Description | Comments |
|---|---|---|
| 01/24/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0125-00155
Permit Description: 1. Delete existing service
2. Install 200a meter with 200a feed thru breaker only on utility pole.
3. Conduit underground 175’ to existing sub panel location
4. Install new 200a main breaker sub panel at same location
5. Add grounding as required.
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/12/2025 | BULD - Electrical Clearance | Passed | Approved 200A service panel upgrade and sub-panel , INCR Clearance to TEP is required | |
| 06/12/2025 | COT - LCEL - Grounding/Bonding | Passed | ||
| 06/12/2025 | COT - LCEL - Electrical Underground | Passed | ||
| 06/12/2025 | COT - LCEL - Electrical Intermediate | Passed | ||
| 06/12/2025 | COT - LCEL - Electrical Final | Passed | Approved 200A service panel upgrade and sub-panel , INCR Clearance to TEP is required |