Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-COM-0125-00150
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
3755 S MISSION RD
Address NEW:
3755 S MISSION RD
Apply Date:
01/23/2025
Applicant:
Lisa Bowers
Description:
Remodel existing office building
Permit Reviews
Permit Number - TC-COM-0125-00150
Permit Status: Complete
Permit Description: Remodel existing office building
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/04/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/08/2025 | APPROVED |
| 03/17/2025 | RESTAMP - COMMERCIAL v.1 | 03/27/2025 | APPROVED |
| 08/28/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/29/2025 | APPROVED |
| 03/07/2025 | COMMERCIAL REVIEW - FULL v.2 | 03/17/2025 | APPROVED |
| 01/31/2025 | COMMERCIAL REVIEW - FULL v.1 | 02/26/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0125-00150
Permit Status: Complete
Permit Description: Remodel existing office building
| Date | Description | Comments |
|---|---|---|
| 03/14/2025 | AIR BALANCING REPORT IS REQUIRED. | |
| 01/31/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 04/03/2025 | Prior to Issuance: This project requires issuance of a Development Package (DP) permit prior to issuance of this permit. Prior to TCO/Final: This project requires full completion of a Development Package (DP) permit prior to Temporary C of O and/or final completion this permit. | |
| 03/14/2025 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 03/14/2025 | Post-Installed Anchor Inspection Report is required. | |
| 01/31/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 03/14/2025 | SPECIAL INSPECTION FOR EFIS IS REQUIRED |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0125-00150
Permite Description: Remodel existing office building
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/06/2025 | COT - HCBU - Building Above Ceiling | N/A | Not Applicable | 8-6-25: not applicable. |
| 08/06/2025 | COT - HCPL - Plumbing Above Ceiling | N/A | Not Applicable | 8-6-25: not applicable |
| 08/06/2025 | COT - HCBU - Masonry Pregrout | N/A | Not Applicable | 8-6-25: not applicable. |
| 08/15/2025 | ENGR Engineering Final | N/A | Not Applicable | No exterior work was completed |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0125-00150
Permit Description: Remodel existing office building
Total Completed Inspections - 18
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/20/2025 | COT - HCEL - Electrical Underground | Passed | Approved . 5/20/202 | |
| 05/20/2025 | COT - HCPL - Rough Soil | Passed | Approved. Okay to backfill. Shading required. 5/20/2025 | |
| 05/28/2025 | COT - HCPL - Plumbing Intermediate | Passed | 5/28/25: plumbing in wall per plan ok to proceed with drywall. | |
| 06/26/2025 | COT - HCEL - Electrical Above Ceiling | Passed | ||
| 06/25/2025 | COT - HCME - Mechanical Above Ceiling | Passed | ||
| 07/09/2025 | COT - HCPL - Plumbing Final | Passed | ||
| 07/21/2025 | COT - HCBU - Excavation/Rebar/Zoning | Passed | ||
| 07/21/2025 | COT - HCBU - Preslab | Passed | ||
| 07/21/2025 | COT - HCEL - Electrical Intermediate | Passed | ||
| 07/21/2025 | COT - HCBU - Framing | Passed | ||
| 07/21/2025 | COT - HCBU - Roof Nailing | Passed | ||
| 08/06/2025 | COT - HCME - Mechanical Intermediate | Passed | 8-6-25: mechanical intermediate approved. | |
| 08/06/2025 | COT - HCEL - Electrical Final | Passed | 8-6-25: electrical final approved. | |
| 08/15/2025 | COT - HCME - Mechanical Final | Passed | 8-15-25: mechanical final approved. | |
| 08/15/2025 | TRSP - ROW - Final/Close-Out | Passed | ||
| 08/15/2025 | COT - HCBU - Building Final | Passed | 8-15-25: building final approved. | |
| 10/10/2025 | COT - FCON - Fire - Final | Passed | ||
| 10/10/2025 | COT - FCON - Alarm - Final | Passed | Passed by C Basaldua |