Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
01/20/2025
Applicant:
Jennifer Vaughan
Description:
Replace an 8 Meter Stack Existing 2 gang meter stack Total number of meters is 8- Like for Like. The meter for 1014 Bussing is burnt out, and requiring the entire stack to be replaced.

Permit Reviews

Permit Number - TC-COM-0125-00124
Permit Status: Complete
Permit Description: Replace an 8 Meter Stack Existing 2 gang meter stack Total number of meters is 8- Like for Like. The meter for 1014 Bussing is burnt out, and requiring the entire stack to be replaced.
Start Date Submittal Complete Date Status  
02/19/2025 COMMERCIAL PDSD SIMPLE REVIEW v.2 02/21/2025 REQUIRES RESUBMIT Review Details
01/22/2025 COMMERCIAL PDSD SIMPLE REVIEW v.1 01/24/2025 REQUIRES RESUBMIT Review Details
02/21/2025 COMMERCIAL PDSD SIMPLE REVIEW v.3 02/24/2025 APPROVED Review Details

Conditions

Permit Number - TC-COM-0125-00124
Permit Status: Complete
Permit Description: Replace an 8 Meter Stack Existing 2 gang meter stack Total number of meters is 8- Like for Like. The meter for 1014 Bussing is burnt out, and requiring the entire stack to be replaced.
Date Description Comments
01/22/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0125-00124
Permit Description: Replace an 8 Meter Stack Existing 2 gang meter stack Total number of meters is 8- Like for Like. The meter for 1014 Bussing is burnt out, and requiring the entire stack to be replaced.
Total Completed Inspections - 3
Date Description Inspector Results Comments
02/26/2025 BULD - Electrical Clearance Passed Approved multi-meter service panel upgrade - INCR Clearance was called into TEP at 1:40pm for units #1013, #1014, #1018, #2021, #2022, #2023, #2029, #2030 (8 total)
02/26/2025 COT - LCEL - Grounding/Bonding Passed
02/26/2025 COT - LCEL - Electrical Final Passed units #1013, #1014, #1018, #2021, #2022, #2023, #2029, #2030 (8 total)

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
PERMIT LETTER- 8METER_V1.PDF DOCUMENTS VIEW