Permit: TC-COM-0125-00110
Permit Details
Apply Date:
01/17/2025
Applicant:
Martha Johnson
Description:
Run new 2” gas service from capped off area of existing gas service on roof Supply and install 85 ft of 2” 1 1/2” and 1” gas service to 2 existing gas pack units on west end of building Gas line will be placed on roof jacks placed every 6ft to properly secure pipe to roof Will supply new isolation valves at both gas packs where gas is to be connected As is will perform gas pressure test to new gas line run before introducing to gas service
Permit Reviews
Permit Number - TC-COM-0125-00110
Permit Status: Complete
Permit Description: Run new 2” gas service from capped off area of existing gas service on roof
Supply and install 85 ft of 2” 1 1/2” and 1” gas service to 2 existing gas pack units on west end of building
Gas line will be placed on roof jacks placed every 6ft to properly secure pipe to roof
Will supply new isolation valves at both gas packs where gas is to be connected
As is will perform gas pressure test to new gas line run before introducing to gas service
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/17/2025 | COMMERCIAL PDSD SIMPLE REVIEW v.1 | 01/17/2025 | APPROVED |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0125-00110
Permit Description: Run new 2” gas service from capped off area of existing gas service on roof
Supply and install 85 ft of 2” 1 1/2” and 1” gas service to 2 existing gas pack units on west end of building
Gas line will be placed on roof jacks placed every 6ft to properly secure pipe to roof
Will supply new isolation valves at both gas packs where gas is to be connected
As is will perform gas pressure test to new gas line run before introducing to gas service
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/27/2025 | COT - BULD - SWG Clearance | Passed | Approved gas piping and pressure test of new lines, SWG Clearance is required | |
| 01/27/2025 | COT - LCPL - Gas Final | Passed | ||
| 01/27/2025 | COT - LCPL - Gas Pressure Test | Passed |