Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Commercial Building
Address:
2802 N 1ST AV
Address NEW:
2802 N 1ST AV
Apply Date:
01/15/2025
Applicant:
Christian Karas
Description:
Coffee Wow Phase 2: Updated equipment and millwork to existing coffee bar. Installation of new drain manifold serving the coffee bar. Added dedicated water line and circuit for coffee wow auto clean system. Add glycol chiller and nitrogen generator for nitro coffee.

Permit Reviews

Permit Number - TC-COM-0125-00095
Permit Status: Inspections
Permit Description: Coffee Wow Phase 2: Updated equipment and millwork to existing coffee bar. Installation of new drain manifold serving the coffee bar. Added dedicated water line and circuit for coffee wow auto clean system. Add glycol chiller and nitrogen generator for nitro coffee.
Start Date Submittal Complete Date Status  
01/17/2025 COMMERCIAL REVIEW - LIMITED v.1 01/29/2025 APPROVED Review Details

Conditions

Permit Number - TC-COM-0125-00095
Permit Status: Inspections
Permit Description: Coffee Wow Phase 2: Updated equipment and millwork to existing coffee bar. Installation of new drain manifold serving the coffee bar. Added dedicated water line and circuit for coffee wow auto clean system. Add glycol chiller and nitrogen generator for nitro coffee.
Date Description Comments
01/29/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-COM-0125-00095
Permite Description: Coffee Wow Phase 2: Updated equipment and millwork to existing coffee bar. Installation of new drain manifold serving the coffee bar. Added dedicated water line and circuit for coffee wow auto clean system. Add glycol chiller and nitrogen generator for nitro coffee.
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
04/28/2025 COT - LCBU - Building Final N/A Re-inspection required Provide GFCI breakers per panel schedules. 4/28/2025
04/28/2025 COT - LCME - Mechanical Final N/A Not Applicable
04/28/2025 COT - LCEL - Electrical Final N/A Re-inspection required Provide GFCI breakers per panel schedules. 4/28/2025
04/28/2025 COT - BULD - SWG Clearance N/A Not Applicable
04/28/2025 BULD - Electrical Clearance N/A Not Applicable

Completed Inspections

Permit Status: Inspections
Permit Number: TC-COM-0125-00095
Permit Description: Coffee Wow Phase 2: Updated equipment and millwork to existing coffee bar. Installation of new drain manifold serving the coffee bar. Added dedicated water line and circuit for coffee wow auto clean system. Add glycol chiller and nitrogen generator for nitro coffee.
Total Completed Inspections - 3
Date Description Inspector Results Comments
04/28/2025 COT - LCEL - Electrical Intermediate Passed
04/28/2025 COT - LCEL - Electrical Above Ceiling Passed
04/28/2025 COT - LCPL - Plumbing Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-14-1454 COFFEEWOW PHASE 2_V1.PDF DOCUMENTS VIEW