Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-COM-0125-00095
Permit Details
Apply Date:
01/15/2025
Applicant:
Christian Karas
Description:
Coffee Wow Phase 2: Updated equipment and millwork to existing coffee bar. Installation of new drain manifold serving the coffee bar. Added dedicated water line and circuit for coffee wow auto clean system. Add glycol chiller and nitrogen generator for nitro coffee.
Permit Reviews
Permit Number - TC-COM-0125-00095
Permit Status: Inspections
Permit Description: Coffee Wow Phase 2: Updated equipment and millwork to existing coffee bar.
Installation of new drain manifold serving the coffee bar.
Added dedicated water line and circuit for coffee wow auto clean system.
Add glycol chiller and nitrogen generator for nitro coffee.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/17/2025 | COMMERCIAL REVIEW - LIMITED v.1 | 01/29/2025 | APPROVED |
Conditions
Permit Number - TC-COM-0125-00095
Permit Status: Inspections
Permit Description: Coffee Wow Phase 2: Updated equipment and millwork to existing coffee bar.
Installation of new drain manifold serving the coffee bar.
Added dedicated water line and circuit for coffee wow auto clean system.
Add glycol chiller and nitrogen generator for nitro coffee.
| Date | Description | Comments |
|---|---|---|
| 01/29/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-COM-0125-00095
Permite Description: Coffee Wow Phase 2: Updated equipment and millwork to existing coffee bar.
Installation of new drain manifold serving the coffee bar.
Added dedicated water line and circuit for coffee wow auto clean system.
Add glycol chiller and nitrogen generator for nitro coffee.
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/28/2025 | COT - LCBU - Building Final | N/A | Re-inspection required | Provide GFCI breakers per panel schedules. 4/28/2025 |
| 04/28/2025 | COT - LCME - Mechanical Final | N/A | Not Applicable | |
| 04/28/2025 | COT - LCEL - Electrical Final | N/A | Re-inspection required | Provide GFCI breakers per panel schedules. 4/28/2025 |
| 04/28/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 04/28/2025 | BULD - Electrical Clearance | N/A | Not Applicable |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-COM-0125-00095
Permit Description: Coffee Wow Phase 2: Updated equipment and millwork to existing coffee bar.
Installation of new drain manifold serving the coffee bar.
Added dedicated water line and circuit for coffee wow auto clean system.
Add glycol chiller and nitrogen generator for nitro coffee.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/28/2025 | COT - LCEL - Electrical Intermediate | Passed | ||
| 04/28/2025 | COT - LCEL - Electrical Above Ceiling | Passed | ||
| 04/28/2025 | COT - LCPL - Plumbing Final | Passed |