Permit: TC-COM-0125-00027
Permit Details
Apply Date:
01/03/2025
Applicant:
James Spix
Description:
Replace ATM & ATM Enclosure
Permit Reviews
Permit Number - TC-COM-0125-00027
Permit Status: Complete
Permit Description: Replace ATM & ATM Enclosure
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/01/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/03/2025 | REQUIRES RESUBMIT |
| 02/12/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 02/18/2025 | APPROVED |
| 01/03/2025 | COMMERCIAL REVIEW - LIMITED v.1 | 01/22/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-COM-0125-00027
Permit Status: Complete
Permit Description: Replace ATM & ATM Enclosure
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 01/14/2025 | SPECIAL INSPECTION FOR EPOXY/EXPANSION/OR POST-INSTALLED ANCHORS IS REQUIRED. |
Conditions
Permit Number - TC-COM-0125-00027
Permit Status: Complete
Permit Description: Replace ATM & ATM Enclosure
| Date | Description | Comments |
|---|---|---|
| 01/22/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 02/01/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 01/14/2025 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0125-00027
Permit Description: Replace ATM & ATM Enclosure
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/22/2025 | COT - LCBU - Building Final | Passed | ||
| 09/22/2025 | COT - LCBU - Framing | Passed | ||
| 09/19/2025 | TRSP - ROW - Final/Close-Out | Passed | ||
| 09/22/2025 | COT - LCEL - Electrical Final | Passed | ||
| 09/22/2025 | ENGR Engineering Final | Passed | ||
| 09/22/2025 | COT - FCON - Fire - Final | Passed |