Permit: TC-COM-0125-00008
Permit Details
Status:
Inspections
Type:
Commercial Building
Address:
254 N MELWOOD AV
Address NEW:
254 N MELWOOD AV
Apply Date:
01/02/2025
Applicant:
Chandler Macomber
Description:
Replacement of existing HVAC for installation of a 2 Ton 14 SEER gas split system. Outdoor condenser on rooftop redwoods. Indoor 80% AFUE gas furnaces and coil in closet.
Permit Reviews
Permit Number - TC-COM-0125-00008
Permit Status: Inspections
Permit Description: Replacement of existing HVAC for installation of a 2 Ton 14 SEER gas split system. Outdoor condenser on rooftop redwoods. Indoor 80% AFUE gas furnaces and coil in closet.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/25/2025 | COMMERCIAL PDSD SIMPLE REVIEW v.2 | 06/25/2025 | REQUIRES RESUBMIT |
| 01/02/2025 | COMMERCIAL PDSD SIMPLE REVIEW v.1 | 01/09/2025 | REQUIRES RESUBMIT |
| 06/25/2025 | COMMERCIAL PDSD SIMPLE REVIEW v.3 | 06/25/2025 | APPROVED |
Conditions
Permit Number - TC-COM-0125-00008
Permit Status: Inspections
Permit Description: Replacement of existing HVAC for installation of a 2 Ton 14 SEER gas split system. Outdoor condenser on rooftop redwoods. Indoor 80% AFUE gas furnaces and coil in closet.
| Date | Description | Comments |
|---|---|---|
| 01/02/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-COM-0125-00008
Permit Description: Replacement of existing HVAC for installation of a 2 Ton 14 SEER gas split system. Outdoor condenser on rooftop redwoods. Indoor 80% AFUE gas furnaces and coil in closet.
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/30/2025 | COT - LCME - Mechanical Intermediate | Passed | 7.30.25 PVC is painted and terminates correctly off of roof. Fuses at disconnects verified. UL listed equipment verified. Air admittance verified at interior units. Proper slope on lines verified. Sediment traps verified. Shut off valves verified. Mechanical equipment verified and observed to be in working condition. |
|
| 07/30/2025 | COT - LCME - Mechanical Final | Passed | 7.30.25 PVC is painted and terminates correctly off of roof. Fuses at disconnects verified. UL listed equipment verified. Air admittance verified at interior units. Proper slope on lines verified. Sediment traps verified. Shut off valves verified. Mechanical equipment verified and observed to be in working condition. |